My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2416 COLBY AVE 1993 REMODEL 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
2416
>
1993 REMODEL
>
2416 COLBY AVE 1993 REMODEL 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:41:57 PM
Creation date
1/27/2017 2:14:28 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2416
Tenant Name
1993 REMODEL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ��� , <br /> PUBL/L" L�YO � <br /> r <br /> f��►�� <br /> ,�.., <br /> ��:- <br /> June 9, 1993 <br /> Mr. Richard Heindel <br /> 'The Dykeman Architects <br /> 1602 Fiewitt Avenue 11400 <br /> Everett, Washington 98201 <br /> RE: Owner: Everett School District Modernization of Main Bldg. Everett High School <br /> Job Address: 2416 Colby Avenue <br /> Plan Check No: B-40475 <br /> Dear Richard: , <br /> In response to your appiication for a construction permit, your plans have been examined and you <br /> aze advised that the issuance of a permit is being withheld for the reasons listed below. These <br /> comments address building issues only, additional revisions or additions may be reyuired by other <br /> departments (such as Utilities, Planning or Fire). All references refer to the 1991 Umform <br /> Building Code, as amended by the State of Washington and/or Washington State Energy Code <br /> 1991, 2nd Fdidon, unless stated otherwise. <br /> A9tIt�/1. The building must be of Type III - 1 hour construction per tabies 5-C and S-D and Section <br /> � 507. <br /> The proposal to apply 5/8" Type 'X' GWB to the underside of floors and roofs will provide <br /> one hour protection for those azeas, however all construction must comply with table 17-A <br /> and Chapter 20. <br /> Specific details, wall sections and building sections must illustrate the proposed assemblies. <br /> � 2. Section 1703 requires the underside of the first floor be protected with one hour <br /> 9C(�f> construcfion if the space under the first floor is usable. <br /> {/I!�' <br /> � Please clarify the proposed use of this s ace. If the space will no[ be used except for <br /> � service of the buildmg then si�nage pro i �nng the use of the space mus e osted �S <br /> �_ � entrance o t e space. r concern is fSatZhe heigfif, siz�msh o this space m es �t <br /> an atcracuve s orage area for someone unfamiliar w�th the buildings construcdon.) <br /> �. Draft stops must be located each 100 ]ineal feet maximum Section 2516(�4.B(iii) <br /> exception. <br /> 4. The boiler room improvements shown on sheet A8.1 wiil require a sepazate set of permits. <br /> Permits can only be issued for specific buildings and not for the campus due to the <br /> limitaUons of our filing system. The drawings may remain in the main building set. <br /> CITY OF EVERETT• 3200 Cedar Street • Everett, WA 98201 • (206) 259-8800 • Fax (206) 259-8856 i� <br />
The URL can be used to link to this page
Your browser does not support the video tag.