Laserfiche WebLink
� �. <br /> • REPAIR SP. �FICATIONS AND LIST .OP WO�. TO BE BID <br /> . . <br /> � pag� _ , . <br /> Address: 2501 Colby <br /> Please call owner for appointment to view the property. <br /> Norm McCue <br /> 206-454-6404 <br /> GENERAL REQUIREMENTS: Construction work shall 6eqin within two <br /> weeks after tbe bid opening and be completed by December 31, <br />� 1985. All work aceas shall be cleaned up by the contractor on _ <br /> a daily basis. <br /> 1. Exterior Paint & Re airs Remove all loose print from <br /> the.. ollow ng bu ng exterior areas: all wood, metal <br /> (some -metal in the soffit-parapet areas) , stucco type <br /> window bay walls (8 bays) nnd the entire front entrance <br /> painted_area from the arch back. Prime all raw wood and <br /> bare metal with appropriate primer manufactured for the <br /> particular surface involved. Give all of the same above <br /> described building areas a final coat of paint. Discuss <br /> the type of paint and color to be applied with the ownet <br /> be�re=_bidding. The owner shall supply all paint <br /> (includes primersj to the contractor. Spray painting <br /> will not be permitted. <br /> Contractor shall not be responsible to paint exterior <br /> doors but shall install points and putty to all windows <br /> as needed and only where frames do not need to be <br /> replaced. Contractor shall coordinate all w:ndow <br /> replecement and repairs with the owner. All opeiiable <br /> window�_shall be left operable after painting. <br /> Power wash all concrete foundation walls (textured block <br /> iappearance) from the masonry belly band down. Wastr down <br /> the side walls of the front steps also. Seal coat prime <br /> the belly band and apply two coats of masonry paint to <br /> the h�,_. and the other washed down areas, owner to <br /> Bnppiy-.— Spray painting not acceptable. <br /> —---- s G _ Sao ' <br /> __. � <br /> 2. Plumbin Replace the galvanized water supply line <br /> rom t e street to the buildinq with 2" copper line. <br /> Restore all duq up areas back to original leaving the <br /> building front yard as it was be:are the beginninq of <br /> construction. Replace the concrete sidewalk along the <br /> north side of the front e,-.t:�1ce stairs. Provide new <br /> bui3ding shut off at same location as old. Remove old <br /> water_ service at building eni.rance and plug any <br /> remaining holes in building foundation in this area of <br /> basement. <br />