Laserfiche WebLink
. ^ �- <br /> r <br /> ' REPAIR SP�..IFICATIONS AND ,LZST .OP WOh.. TO BE BID <br /> . Page ___ �-: <br /> Address: 2501 Colby <br /> Run new copper piping, sized to code, up to each <br /> apartment unit using the ver•tical chases (shafts) <br /> adjacent to each unit as a convenient location foc <br /> aupply lines. All water lines in the shaft areas ahall <br /> be type "L" copper and wrapped with foam type <br /> insulation, tlie rest can be type "M" copper. Install <br /> shoe�-40 gal. hot water tanks (30" x 22" wide) , with two <br /> �500 watt elements (quir.k cecovety) and 5 year warranty <br /> (left with the owner) , in. the kitchens of all units. <br /> �� �—" - - -----Remore---the small refrigerators from over the kitcher� <br /> counters and install new tanks in the �ame spaces. The <br /> tanks in cnits #18 � #19 shall be placed in room corner <br /> orr-same- wall as kitchen sinks. The new tank in Unit #21 <br /> to be placed in southeast corner of kitchen. All new <br /> tanks to be closed in with 1/2" plywood complete with <br /> one"pat�Y screwed to frame for easy access. Thia work <br /> is called out in carpentry item. Plumb in tanks. <br /> comolete with pcessure relief valves. and drains to <br /> building shafts (chase) . Place a water shut-off to each <br /> entire unit before water enters hot water tank. <br /> Remove kitchen sinks in all units and install new 33" x <br /> 22" double bowl stainless steel sinks (no sprayer) , <br /> - plumhing in each complete with faucet. Run new sucface <br /> mount hot and cold copper water lines to sink hiding new <br /> lines in back of existing and new kitchen cabinets as <br /> much._as_possible. Note new 36" kitchen si.^,� cabinet and <br /> new counter tops to -be installed in another spec item. - <br /> Run hot and cold water 13nes to all bathroom plumbing <br /> fixtar-aa-- in each apartment unit. Place water line � shut <br /> otfa at eac!► fixture. All other water lines to be <br /> surface mounted exceptsrhere new lines can be hidden in <br /> yia2�a--w#thout major patchwork. <br /> All new faucets shalY tr� washerless, single lever, Moen <br /> Chateau �7531 ot equal. All new plumbing wock shall be <br /> performed in compllanCe wtth the requiremer�ts of the <br /> --•. ---- - !r^+ f�Pl��mbinq Code, 1982 edition. <br /> Ceatzactnr_ shall be responsible to patch and match <br /> surroundinq surfaces where old plumbing will be removed <br /> � and--�awly damaged areas where new plumbing work takes <br /> place. Plumber ahall •�ote that fn units where new - <br />� - "-- _- -�nndee��agment is installed, adjustments will have to be <br /> made to the toilets and tubs when .reinstalled. <br /> I ! �� 3o . zov — - __ <br /> 3. Electrical Service. Remove the building service <br /> w r ng an install new service, copper wiring, sized to <br /> -handir---the building electrical load demands following <br /> complekion oE all new wiring (including electric heat) <br /> called out in this spec. Clean up the electrical panels <br /> . � ancl add new meters for each apartment enit and install <br /> house meter and 125 amp house panel complete. <br /> Y <br /> =, <br />