Laserfiche WebLink
' S�.�MBrickldevelopment revie�M2008\10-Oct\Var07-002-Pevt.xls Pnnted.70/2g/2008 1127 AA7 <br /> Project Name Banner Bank Variance Traffic Reviewer MGB <br /> Project Location 2529 Colby Avenue Dev Reviewer 13S <br /> Project Description 3,996 8ank 8 3,478 Office Building(Revised Square Footage)Planner SI <br /> R¢ceived Date 10l28I2D08 Due Date 10/28/2008 Review Date W282008 File# VAR07-002-Revlsion 1 <br /> Area Type ❑X CBD �SW Evereit �Remainder <br /> �TRAFFIC STUDY REQUIRED <br /> Site Access <br /> �% Check Sight Distance(From Table 1,attached) nAt Intersections ❑X At Dnveways <br /> Residentiai Development-Vertical Clearance from 30"to 60"abe:e pavement 10'lrom Back of Curb <br /> X Commerual Development-Vertical Clearance trom 30"lo 84"above pavement 15'from Back of Curb <br /> Right In I Right Out Tum Restriction al �Conddion of Permit Possible in Future <br /> Aaess point requires lrafficcontrol device �Stop Sign �Yield Sign Signal �MediaNlslantl <br /> X All roadways and driveways musl meet City of Everett Design Standards <br /> Access point is public roadway,use City of Everett slandard interseMions <br /> Access point is pnvale roadway, use City of Everett standard dnveway plans <br /> Check access point �Spacing-Adjacent �Spacing-Opposde ❑Throat Depth �Gratle <br /> All access points must be paved <br /> Reduce potential conflict points �Access Points �Street Intersections �Dnveway Cut <br /> Access point requires realignment <br /> Access points require wnsolidation <br /> Shared access wilh adjacent property required <br /> Provide pedeslrian access to �City Sidewalks �All Bwlding Doorways � <br /> Pedestrian faciGties must be separated(rom vehicular traffic <br /> Potential emergency vehicle access issues-Review wiih Fire Marshall <br /> X Site access acceptable as shown if sight distance from bank dnve-Ihrough exit is maintained for pedestrian safety <br /> X Driveway to Colby Avenue must be clearly signed"Do Not Enier"(acceplable as shown) <br /> Site Circulation and Parkfny Issues <br /> Provide project Iucalion map,including adjacent driveways, local and arterial intersections <br /> Provide delailed site plan,induding circutation and parking details <br /> Reduce potential intemal circulation conflicts <br /> Provide at least_Total Parking Spaces <br /> Provide at leact_Visitor Parking Space <br /> Provide parking analysis indicating total estimated parking demand for project <br /> X Parking layout must be wnsistent with City o(Everett Standards <br /> All parking areas should be paved <br /> Pedestrian route should be between parking rows and separated(rom vehiGe drive surface <br /> Provide commercial vehiGe tum-around space/Wming radius <br /> Provide freight vehiGe tumaround space/tuming radius <br /> Is freight loading/unloading zone required <br /> Check dumpster loca[ions with disposal company <br /> X No parkin required for�on-residential dEvelopment in 8•3 Zone <br /> X Parkin la out and access oft alley is acceptable as shown <br /> City of Everett StaH Use Only �/l �) <br /> CL'� <br />