My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2707 COLBY AVE BASE FILE 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
2707
>
BASE FILE
>
2707 COLBY AVE BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 3:56:06 PM
Creation date
1/27/2017 5:01:30 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2707
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br />IS May 1993 <br />Mr. Warren Burns <br />BUILDING LIFE SAFETY SYSTEMS <br />(pressurized) with air while the fire floor will be exhausted. The exhaust air <br />quantity will, be a•minimum of one exhaust air change per each ten minute <br />interval. A remote annunciation panel will enable fire fighters to manually <br />control the mechanical air handling system. <br />Code Requirement <br />Per the 1991 uniform Building Code section 1807 c-B: <br />In seismic zones 2,3 & 4 in addition to the main water supply a secondary <br />on site supply of water equal to the hydraulically calculated sprinkler design <br />demand plus 100 gpm gallons per minute, additional for the total standpipe <br />system shall be provided. This suppiyshall be automatically available if the <br />principal supply fails and shall have a duration of 30 minutes. • <br />proposed System Design: <br />Because the project is located in a seismic zone 3 a secondary water <br />source will be provided. The proposed design is to provide a domestic <br />water connection to the fire sprinkler water service piping. This connection <br />will serve as a secondary water source to the fire sprinkler system in the <br />event of a fire water service line failure (sea Sketch 2). The secondary water <br />connection will be installed per the requirements of the City of Everett for <br />backflow prevention. <br />. I <br />V•• <br />Wd . <br />s'd s!tihirnA woo sm),dau WHL0:60 E6, 0T d3S <br />
The URL can be used to link to this page
Your browser does not support the video tag.