My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2707 COLBY AVE BASE FILE 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
2707
>
BASE FILE
>
2707 COLBY AVE BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 3:56:06 PM
Creation date
1/27/2017 5:01:30 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2707
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
asbestos -related work must be performed by Asbestos Lazard <br />Emergency Response Act (AHERA) certified asbestos workers. <br />4. Prior to demolition activities, all fluorescent light ballasts <br />that do not contain PCB -free labels will be properly removed and <br />disposed of. <br />G. ENVIRONMENTAL HEALTH: RODENTS (SEPA Environmental Health <br />Policies) <br />1. The Applicant must implement a baiting and trapping program at the <br />Colby Square site prior to demolition activity. The program <br />should begin at least 30 days prior to demolition. The program <br />should be coordinated with the Snohomish Health District. <br />H. LAND USE (SEPA Land and Shoreline Use Policies: '.relationship to <br />Land Use Plans and Estimated Population, Light and Glare, <br />Aesthetics; SEPA Other Policies) <br />Development Standards <br />I. The proposal must comply with the setback requirements, building <br />height requirements, gross floor area ratio (GPAR) requirements, <br />and building facade requirements listed in Section 22.020 of the <br />Zoning Code. <br />2. Prior to issuance of any building permits for the theater, a <br />Planning Director Approval is required for an "Alternative Method <br />of Design" for the Community Theater facade on Wetmore Avenue. <br />The Applicant must submit an applicaticn for the proposed <br />Alternative Method of Design, which shall be reviewed using Review <br />Process IIB per Section 22.020 of the Zoning Code. <br />D_gsian Review Aop ova <br />Prior to issuance of any grading or building permits for the proposal, <br />other than soils remediation permits, the Planning Director must issue <br />a Design Review Approval per Section 22.030 of the Zoning Code. If <br />the proposal is phased, a Design Review Approval is required for the <br />detailed plans for each phase. <br />The Applicant must submit an application for Design Review Approval, a <br />detailed site plan, building plans, rendered building elevations with <br />details of the street level facades, and a streetscape plan. The <br />streetscape plan shall consist of a public/pedestrian amenities <br />element, a frontage improvement element, an open space element <br />(plazas, building atriums and pedestrian arcades), and a landscaping <br />element. All of these plans should show topographic variations on the <br />site. The streetscape plan must include details regarding design <br />features such as sidewalk paving, seating areas, lighting fixtures, <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.