My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2710 COLBY AVE EVERETT SYMPHONY 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
2710
>
EVERETT SYMPHONY
>
2710 COLBY AVE EVERETT SYMPHONY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 7:50:18 AM
Creation date
1/27/2017 5:33:04 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2710
Tenant Name
EVERETT SYMPHONY
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 16, 2005 'I <br /> Mr. l�ony Lee <br /> Plans Examiner <br /> City of Everett Engineering /Public Services Department <br /> 3200 Cedar Street <br /> Everetl, WA 98201 <br /> RE: Everett Symphony <br /> Pian Review No.: 60501-009 <br /> Dear Tony: <br /> The following are our responses lo the comments from your letler daled January 20, <br /> 2005 and as numbered in your letter: <br /> Generel <br /> 1. Comment: An analysis cf the lateral force resisting system should be provided <br /> for review. Section 3406.1 <br /> BNH Response: The requested engineering has been pro:�ided. <br /> 2. Comment: The plans should note than an approved monitcred fire �larm is <br /> required. City of Everelt Ord. 1902-92 <br /> BNH Response: This note has been added to the project dala on sheet (;S. <br /> 3. Comment: The code data on sheet CS should be revised to reflect the 2003 IBC <br /> for the construction type, building area and ailowable height. <br /> BNH Response: This change has been made to General Note #1 en sheet CS. <br /> 4. Comment: The building is wilhin aliowable are for V-B (sprinklered), A-1/B/S-1 <br /> Mixed Occ��pancies. Table 503 <br /> BNH Response: <br /> 5. Comment: The hot waler lank should be strapped to resist lateral movement. <br /> Section 301.15 IMC. <br /> BNH Resp�nse: Detail has been added to sheet A7.1. <br /> Exitinq <br /> 1. Comment: Fire-raied corridors are not required for ih;� project—their use will be <br /> at your discretion.Table 1016.1 <br /> BNH Response: The walls to ihe corridor on A1.0 are no longer fire-rated. <br /> 2. Comment: The type of emergency power backup for lhe illuminated exit signs <br /> should be shown on the plans. Section 1011.5.3. <br /> BNH Response: Please refer to keynote 2.1 on A2.0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.