Laserfiche WebLink
l <br /> � p t shoupld be ex mPt SSee UBC �se t en 021 t5.7 Q stage & orchestra <br /> . This item si�ould aiso be addressed in the letter requesting <br /> exemptions. <br /> 8. Master Plan�ing Process: <br /> . Question was posed as to the benefit or detriment of pursuing a Master <br /> ;%lan Process. <br /> . Code requirements will be enforced upon reaching one half of the <br /> appraised value of building o�:er a period of 5-1/2 years (70 mo.). <br /> . This process is beneficial if the Owner would li'<e to be locked into current <br /> code requi�ements only, but the general trend i�f codes have been one of <br /> becoming more reasonable. Therefore, it does not seem beneficial to <br /> pursue this option. <br /> . The appraised value of the building can be acquired through the City by <br /> address. <br /> 9. Suggested Contacts: ', <br /> . Sue Alden of 8agley Wright Theatre is very well versed on ADA issues � <br /> regarding the performing arts. <br /> 10. Permit procedure: ! <br /> . A letter requesting exemptions, preceding permit application is recommend. <br /> The record of this meeting is written to the best ot our recollectio�, if there are any # <br /> items not included or in conflict, please let us know. Thank you for your time and <br /> attention on this matter. <br /> Sincerely, I <br /> BOTESCH, NASk & HALL ARCHITECTS, P.S• <br /> ��,�" K� " r-,�. . <br /> Shiriey K. Tomita <br /> � <br /> Skt <br /> cc: Steve Miller , � <br /> Tony Lee �'I <br /> Doug Yark � <br /> i I <br />