My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3019 COLBY AVE 2018-01-01 MF Import
>
Address Records
>
COLBY AVE
>
3019
>
3019 COLBY AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2019 1:34:57 PM
Creation date
1/27/2017 9:34:01 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3019
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> . . i _ _ _ I, <br /> _ I <br /> � <br /> I � <br /> , <br /> I <br /> . , <br /> 4. 1972 Plan; Halprin Policy 7, Commerce and Finance, "Identify, improve and <br /> ' utilize structures of particular architectural and historic interest in the <br /> downtown area, "recycle" fine old builr.'ing rather than remove them:' � <br /> � . <br /> iConclusion: The inability to renovate this building as proposed would be in � <br /> � conflict with the Comprehensive Plan. ' <br /> I � <br /> I RECOMMENDAT[ON: APPROVAL i <br /> � Approve a variance for 4 parking spaces rather than the required SO in the B-3 zone <br /> iwith the following conditions: � <br /> 1. Participation in voluntary employee carpool program is required. i <br /> 2. Community transit and Everett transit schedules shall be readily available and <br /> posted at a conspicuous location to encourage employees in the office complex � <br /> ' to use public transportation. � <br /> 3. The applicant shall convey a Fower of Attorney for the creation of a local <br /> l improvement district for a future public off-street parking structure. <br /> i <br /> 4. The applicant shall provide parking in the basement of the structure to the <br /> Idegree physically ieasible. <br /> 5. A detailed drawing shall be submitted to the Public Works Department showing I <br /> parking layout, landscaping, driveways, utilities, storm drainage, and all <br /> I required improvements to the public right-of-way. Public Works Department <br /> approval of these drawings is required before any permits are issued. All � <br /> iimprovements shall be completed before the Occupancy Permit is issued. <br /> � 6. Participation in the program to fund the north end sanitary sewer intcrceptor is <br /> ! required. � <br /> II <br /> 7. During construction, city streets are to be kept clear of dirt and debris and all � <br /> truck traffic to and from the site within the City of Everett shall be on arterial � <br /> streets unless otherwise approved by the Public Works Department. I <br /> I I <br /> I , <br /> � <br /> I <br /> *APPROVED BY THE BOARD OF ADJUSTMENT January 11, 1982 . j <br /> Date i 'i <br /> VOTE: FOR HGAINST ABSENT ABSTAIN � <br /> 1 <br /> Mr. Hoagland: x � � <br /> Mr. Wilson: x i <br /> Mr. Zook: x : <br /> Mr. Eckstrom, Sr. X ' <br /> � <br /> i { <br /> �� ��.rS�...J i <br /> Chairman, Board of Adj� ment � ; <br /> I <br /> I f <br /> *Additional stipulation by the Board of Adjustment states that Applicant will have the I � <br /> opportunity to apply for 0 parking spaces with no application fee. I I <br /> I <br /> i � <br /> I I I <br /> I I � I <br /> I <br /> � <br /> � <br /> � i <br /> � _ � <br />
The URL can be used to link to this page
Your browser does not support the video tag.