Laserfiche WebLink
EXHIBIT B <br /> COMPENSATION "' 3 <br /> ALTERNATE A [HOURLY RATE UP TO A MAXIMUM AMOUNT] <br /> The City shall pay the Contractor a sum equal to the amount of hours actually worked multiplied by the <br /> rate identified herein for the staff performing the Work, subject to the maximum stated in¶4(D) of this <br /> Agreement. This applies only to the Mechanical &Electrical scope of work as described in Exhibit A. <br /> Name Responsibility Rate Est.Hours Extension <br /> Rice Group Mechanical <br /> Principal $95 <br /> Engineer $85 <br /> Drafting $65 <br /> Clerical $38 <br /> Total $5,500.00 <br /> AWA Electrical <br /> Lyle Adcock Engineer $95 67.368 $64,000.00 <br /> Total $6,400.00 <br /> ALTERNATE B [LUMP SUM] <br /> The City shall pay the Contractor(Robert W Champion—Architect AIA)a fixed sum of Twenty One <br /> Thousand and Five Hundred Dollars($21,500.00). This applies only to the Architectural scope of work <br /> as described in Exhibit A <br /> 14 <br /> 10 <br />