Laserfiche WebLink
1 <br /> ; <br /> Page 2 • � <br /> March 5, 1971 <br /> II <br /> 8. Day Care Rooms I <br /> Day care rooms below grade shall have one exit accessible airectly to exterior other � <br /> than corridor by the following method, ar the alternate (b) below. I <br /> May 10, 1971 a. Reduce width of folding partitions and install new solid core <br /> doors between each of three rooms. Short partitions having [he � <br /> doors shall be 1-hr. and add a metal stair from court (area way <br /> in front of building)to ,rade. <br /> :iay 10, 197I �. (altecnate) Add to the fire alarm system a smoke detector system <br /> in lower €]oor corridor. System shall have 3 smoke detectors one <br /> in the middle. Ylans for the smoke detector shall be included <br /> with the fire alarm plans. Af[er installation smoke detector <br /> system shall be demonstrated. <br /> 9. May 10, 1971 Provide an approved fire alarm aystem for the entire school area. <br /> It is reco�mnended that the alarm system be installed on all floors <br /> to provide for a future expansion of the school facilities. <br /> 10. March 10, 1971 Contructor to furnish a set of plans for the fire alarm system <br /> prior to the installation. <br /> 11. May 10, 1971 Second Boiler Room: Shall have 1-hr. separation from the rest of <br /> the building. <br /> " Second Floor (Main floo+- level) <br /> 12. Stairway (I1est Stair) ' <br /> May 10, 1971 a. Install a 1 3/4" solid core door with self closer and fusible <br /> link from Sancturary. Door to swing into stair hall. <br /> May 10, 1971 b. Install same as 12a above from hall to stair hail. <br /> May 10, 1971 c. Add a layer of ;" gypsum board over all walls having only �" <br /> gypsum board on each side of wall. <br /> 13. bfain Floor Corridor. <br /> June 10, 1971 a. Add =" gypsum board over all walls having only '�" gypsum board <br /> on each side of walls. <br /> June 10, 1971 b. All doors shall be solid core. Doors less Chan 1 3/4" shall <br /> have a coat of fire retardant paint. <br /> June 10, 1971 c. Window to library shall be '�" wire glass in metal frame, or shall <br /> have a 1-hr. partition behi.nd the window, making it a disnlay <br /> case. Access to the display case from rear shall be with 1 3/4" <br /> solid core doors. � <br /> Third Floor <br /> 14. Marcli 1, 1972 All partil•ions shall be 1 hr. Install ?�" gypsum board over c�alls <br /> having only '�" gypsum board. <br /> 15. March 1, 1972 All doors to corridors shall be 1 3/4" solid core. <br /> 16. March 1, 1972 Front stair shall have 1 hr. walls and ceilings. <br /> 17. t�f�rch 1, 1972 All ceilings shall be 1 hr. construction. <br /> 18. March 1, 197� All elecCric work shall comply with the electrical code. <br /> Gencral <br /> 19. June 10, 1971 All walls shall bc 1 hr, construction (2 layers of �" �ypboard, ) <br /> 2C. June 10, 1971 Add a 1 3/4" solid core door in a 1 hr, wall separating stair to <br /> assembly room below from corridor to stairway above. <br /> 21. April 10, 1971 Fire extinguishers are to be mounted so tliat top is not more than <br /> 5' above floor. <br /> 22. Afarch 20, 1971 Recliarge the soda and acid fire extin�;visher at Lhe corridor. <br />