Laserfiche WebLink
Page 4 9 <br /> 2/11/2004 <br /> Exhibit A <br /> Task 6 - Optional Extra Services: <br /> If the City desires, ECS can provide additional services, on an hourly basis at the rates in affect at the time <br /> of service, for work outside the scope listed in this letter. <br /> SCHEDULE: <br /> The specific schedule for this work has not been established. In general, each component will require 1 —2 <br /> weeks from notice to proceed to schedule and facilitate the initial meetings. Each component will take 2—4 <br /> week from the initial meeting to submit the draft information and 1 to 2 weeks after the review meeting to <br /> submit the final technical memo. <br /> DELIVERABLES: <br /> ECS will provide the following deliverable items in accordance with the above schedule: <br /> 1. Project schedule <br /> 2. Meeting minutes (6). <br /> 3. Future loads finding memo. <br /> 4. Draft& final under-grounding layout drawing. <br /> 5. Under-grounding cost estimate <br /> 6. Draft& final power reliability memos and drawings <br /> 7. Draft& final power monitoring information <br /> INFORMATION AND WORK TO BE PROVIDED BY CITY: <br /> Per our discussions,we have identified the following items that will be provided by the City: <br /> 1. Plant studies and evaluation documentation related to future plant expansion and load information. <br /> 2. Electrical facilities drawings for each of the buildings that will require modification for the metering. <br /> We propose to accomplish this work on an hourly plus expenses basis not to exceed the amount shown on <br /> the attached Fee Estimate worksheets. <br /> We very much appreciate the opportunity to provide these services-for this project. If you have any <br /> questions or need any additional information,please don't hesitate to contact me directly. <br /> Sincerely, <br /> ECq E , INC <br /> avid Bloxo ,:P.'. <br /> President <br /> Attachment: Fee Estimate Work Sheet <br /> 47 <br />