Laserfiche WebLink
-� _ <br /> MITIGATED <br /> DETERMINATION OF NON-SIGNIFICANCE <br /> SEPA i/87-94: Cobalt Building <br /> DESCRIPTION OF PROPOSAL: The proposed action is for the issuance of Building and <br /> Public Works permits for the construction of a 10,000 square foot, three story, Type V 1-hour, <br /> wood and steel frame, sprinklered office building with elevator on a 14, 188 square foot site. <br /> 5, 675.5 square feet of the proposed project site is in the B-1 zone and 8,512.5 square feet is in <br /> the R-5 Clinic/0ffice overlay zone. The proposal include a 20 stall parking area on the main <br /> level, with 6 additional stalls on a lower level, new sidewalk and landscaping areas. The bulk of <br /> the proposed office building will be located in the R-5 C-0 overlay zone, while much of the <br /> parking area will be in the B-1 zone. <br /> PROPONENT: Mr. Ken Brewe <br /> The Cobalt Group (252-5167), Everett, WA 98201 <br /> REPRESENTATIVE: Mr. John Cannon (206) 827-5602 <br /> Lewis Architects, 2800 Northup #100 <br /> Bellewe, WA 98004 <br /> LOCATION: 3519, 3523, & 3525 Colby Avenue, North of 36th Avenue <br /> ZONING: B-1 on the south & R-5 with Clinic-Oftice Overlay on the north portion <br /> GENERAL PLAN: 2.5: Clinic, Medical & Professional Office&Multiple Family <br /> Lend Agency: City of Everett Planning Department <br /> Contact Person: Justin C. Osemene, r�ICP Phone: 259-8731 <br /> Miti�ation Measures: <br /> The environmental impacts of this proposal are documented in the Environmental Checklist and <br /> � other information on file with the City. The listed requirements are placed in response to our <br /> review of this infortnation: <br /> AGENCIES WITH NRISDICTION: None <br /> MTTIGATION OF ADVERSE IMPACTS BY SEPA <br /> 1, Any grading/fill on this site shall be done so as to not impact the surcounding properties. <br /> (SEPA Earth, Land and Shoreline Use Policies.) <br />