Laserfiche WebLink
PUBL/� I�t/O/�Kri <br /> PC �Y B48384 <br /> 7une 13, 1995 <br /> Page 4 <br /> �25. Provide lighting power budget calculations lo show proposed lighting wattage's. <br /> ✓26. IIlustrate stair construction. <br /> �,?71�D 27. Detail 7 sheet A6 indicates wood ftaming and sheathing in contact with <br /> concrete. This wood must be pressure treated. <br /> In order for the processing of your applicadon w wnGnue, it will be necessary to <br /> provide the Building Division with two wmplete new sets of dcawings reflecdng the <br /> correcdons requested. <br /> Upon msubmittal of the drawings, your applicadon will be given priority and plan <br /> review will recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to <br /> ensure that the prcposcd structure will be constructed in compliance with all adopted <br /> codes. <br /> Sincerely <br /> C � <br /> Je frey . McF <br /> Associate Engineer/Building <br /> JM:pc848]Bljd: <br /> ` � <br /> . ����� r <br /> 4 <br /> � = ��. � <br /> CITY OF EVERETT•3200 Cedar Street• Everett, WA 98201 •(206)259-8800 • Fax (206)259•8856 <br />