Laserfiche WebLink
i <br /> 6. The Uniform Buildina Code requires compliance with current <br /> building code for new use. An inspection by the building plan <br /> review staff is recommended prior to construction. <br /> 7 . The water service must be metered and the sewer services� must <br /> meet Everett Municipal Code Standards for a commercial use. <br /> 8. Applicant must submit plans to the City Building Department for <br /> permits as requi.red for change of use by the Uniform Suilding <br /> Code. <br /> Upon reviewing the current site pla7 for this proposal , it appears <br /> that a revised site plan wi11 be necessary upon building permit <br /> submittal which meets all the above requirements, before approval can <br /> be obtais�ed for this project. <br /> Any future change of use of the property will require review by the <br /> Planning Department to determine if the new use meets the intent of <br /> this permit or if it will require a new application. <br /> t y�`�=�1����E-�r�/�S/��� <br /> Paul A. Roberts <br /> Director <br /> Community Development & Planning <br />