My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4020 COLBY AVE 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
4020
>
4020 COLBY AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2020 3:25:24 PM
Creation date
1/27/2017 2:30:05 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4020
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. S lices - All s lices shal_ be B I <br /> P arrel Crimped wit}i a <br /> de-ox compound and made to be water-tight. Where tliere <br /> are more than two wires aL• a splice point a spli.t-bolt <br /> type lug may be used . Wire-nuts shall not be used . <br /> E, Conduit - The contractor shall install 2" P.V. C. <br /> schedule 40 to all poles according to the at�ached <br /> schemat�.c. Cover over conduit shall be 12" where new <br /> concrete or asphalt pavement is to be placed above the <br /> conduit . All pole risers shall be schedule 80 or rigid <br /> CORaUit . <br /> EXCEPTION: Where contractor must utili.ze existing <br /> conduit complete raceway from pole to pole or pole to � <br /> J-box, �n this case like materials shall be used. All <br /> exceptions subject to approval of Project Manager . I <br /> F. Fuses - Fusing shall be, reliance time delay. <br /> Breakaway fuse holders . Fuse holders are breakaway type <br /> Elastimold style 65 . Fuses shall be Model t MEN-10. <br /> G. See all attached drawings . <br /> IV. Final Acceptance <br /> A. Restoration - Any cracked or uamaged improvement such <br /> as sidewalk , curb or autter shall be ceplaced according <br /> to W.S.D.O.T Spec. 8-2U. 3( 3) (page 432. ) I <br /> B. Functional Testinq - The Lighting System shall be <br /> tested according to section 8-20. 3( 11 ) of Y.he 1988 ! <br /> W.S.D.O.T. Standard Specifi.cations . <br /> C. Final Inspection - Final Inspecti.on of the <br /> streetli.ghting system shall be arranged with the Public <br /> Works Inspector as soon as the system is complete . The <br /> C9.ty Electrician shall inspect the system and any defects <br /> shall be repaired at contractor 's expense and <br /> reinspected. The total system shall meet the <br /> Electcicians satisfaction and be acceptable to City the <br /> owner . <br /> D. As-built Drawings - Upon completion of the work, <br /> as-built information and drawings shall be submitted to <br /> the Project Manager by the contractor pri.or to issuance <br /> of a CertiFicate oE Occupancy. <br /> E. WarrantY - The contractor shall submit a wri;.ten <br /> warranty to supply labor and materials for any <br /> streetlighting system repai.rs for one year a.teL f�.nal <br /> acceptance of the project by the City. The coi.l•ractor <br /> shall commence cepairs to the li.ghting system within 30 <br /> days of notification by the City . Such war�anty shall be <br /> sumbi.tted to the Faci.liti.es Division prior to issuance of <br /> the Certifi.cate of Occupancp . <br />
The URL can be used to link to this page
Your browser does not support the video tag.