Laserfiche WebLink
, : _ -- - . , <br /> .� - <br /> ,"' Del Aussell <br /> :'VE'i't't� <br /> "`°" publie Works Dept. � <br /> °A1E October 1, 1979 <br /> SU[�J¢i PaBe TWO CITY OF EVERETT. [VERE'T, WASNINGTON � � <br /> request?d for reduction will require all the currently vacant <br /> spaces and add to an already serious pi•oblem. <br /> 8. It is not unreasonable to assume that the Public Works Departoent <br /> SEPA Review will result in a requirement that on-site parking meet <br /> or exceed code requirements irregardless of Board of Ad�ustment <br /> action. <br /> For the preceding reasons, it is the recommendation of the Public Works —' <br /> Department that: <br /> The Bpard of Ad�ustment deny the proposed variance; or <br /> Alternative Recommendation: That the Board of Ad�ustment postpone <br /> the variance request for one month so that a proper <br /> parking study required by SEPA ean be made prior Lo final <br /> determination by the Board. <br /> CIS:is <br /> cc: Aon Cameroa, Traffic Engineer <br /> Ken Callahan, Building Direotor <br /> Brad Cattle, City Attorney <br /> Dennis Derrickson, Planning Direetor <br />� <br /> -- �-- - <br />