My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5201 COLBY AVE 2016-01-01 MF Import
>
Address Records
>
COLBY AVE
>
5201
>
5201 COLBY AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2017 5:51:46 PM
Creation date
1/27/2017 4:09:12 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
5201
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� -.- <br />r:., _' . l� <br />CITY OF EVERETT 1���2.ppl <br />PLANNING DIRECTOR DETERMINATION <br />Up to 25% Expansion of a NCU <br />Review Process 11 #01-010 <br />Conaway Motors <br />INTRODUCTION: The City of Everett Pianning Department has received an application from <br />Conaway Motors, 5201 Colby Avenue, Everett WA 98203, to demolish an existing 862 square feet of <br />garage/shop area, and replace with a new 1,554 square foot office/repair shop. Section 38 of the City's <br />Zoning Code allows for the Planni�g Uirector to permit the expansion or change of a non-conforming <br />use or building, provided that the change or expansion complies with all other requirements of the <br />zoning code ordinance: and that lhe nonconformity has been certified by the Planning Department. <br />BACKGROUND: The property is located in the R-3, Multiple Family Medium Density zone. The site is <br />developed ��ilh an existing auto repair business with associated vehicle garages. The R-3 zone <br />restricts this site to residentiai uses, however the auto repair use has been certified as a legal non- <br />conforming use (NCU #2). This proposal is considered an expansion oF a non-conforming use and is <br />subject to Review Process II and the evaluation criteria listed in Section 38.090 and as follows: <br />The impact of traffic generated by the proposed use on the surrounding area, pedestrian <br />circulation and public safety; and the proposal's ability to mitigate potential impacts. <br />Findings: Access to the site is gained from a driveway off of Colby Avenue. There is a drive <br />thru lane in iront of the existing buildings, running parallel to Colby Avenue, which allow cars to <br />enter the sile, and then drive into the north garage. The new structure will allow tor additional <br />cars to be parked inside, and away from the drivelanes on site. The additional indoor parking <br />will also clear up the congestion in the parking lot and should allow for more organized <br />circu�ation on site. ' <br />Conciusions: The existing structures have been used for auto repair for over 50 years, and the <br />minor remodel of the existing garage should not generate any additional traffic. The proposed <br />changes to tha repair shop will lend to a more orderly use of the on site parking facilities, and <br />improve pedestrian trafiic on the west side of the business. <br />2. The site has suNicient area to provide for off-street parking, landscaping and screening <br />from adjacent uses. <br />Findings: The neighboring property has expressed concern over ihe parking siluation on site. <br />Parking will need to be provided in accordance wiih City Standards, including Section 34 of the <br />Everett Zoning Code. The City's Zoning Code requires three parking stalls to be provided on <br />site, plus two per service bay, with each service bay counting as one space. A minimum of 13 <br />parking stalls are required on site for this business activity; the thirteen stalis provided on site <br />should be located outside the service garages. According to the applicant there are 37 parking <br />stalls on site, including those contained in the garages. There is a chainlink fence around the <br />south and east property lines. The site is nonconforming per landscaping requirements, and will <br />need ta be brought into conformance concurrently with the new proposal. <br />Conclusions: The proposed conversion of the shop area from 862 square feet to 1,552 <br />square feet shouid not require any additionai parking to be provided on site. A redesign of the <br />parking facility may be necessary to accommodate on site landscaping. The parking layout <br />�y <br />
The URL can be used to link to this page
Your browser does not support the video tag.