Laserfiche WebLink
should be sensitive to the neighboring residential activities. Approval of the new parking <br />arrangement is required at time of buiiding permit appiication, to ensure the required parking is <br />provided on site. The proposal is required to comply with current parking and landscaping <br />requirements. Landscaping will need to be provided on site in conformance with Section 35 of <br />the Everett Zoning Code. A landscape plan, and associated warranty devices, will need to be <br />provided at time of building permit submittal. <br />3. Provides a service to the generel area. <br />Findings: The proposed service garage revisiona w•ill imp-ove the current vehicle circulation on <br />site and improve pedesirian traKc on site and adjacent to the site. The repair business nas <br />been in operation for over 50 years, and continuas to provide this service to the surrounding <br />communiry. <br />Conclusions: The proposal continues to provide a benefit to the general ansa. <br />4. The adequacy of streets, utilities and public services to accommodate t:he proposed use. <br />Findings: The site is served by public streets. It is located on the southeasl corner of Coiby <br />Avenue and 52n° Street. There is an existing building on the site with existin{3 utilities and public <br />services. <br />Conclusions: Adequate provisions for access, utilities and public services fur the proposal can <br />be accommodated. <br />5. Compatibiliry of the proposed use or building to surrounding properties, especially as it <br />relates to size, height, location and setback of buildings. <br />Findings: The proposal is to remove the existing service garage on the south side of the lot, <br />and replace with a slightly larger service garage. The diiterence between the two structures is <br />approximately 692 square feet. The proposed buiiding would be consistent with the other <br />structures on site, however will appear new, and therefore more aesthetically pleasing. <br />Conclusions: Landscaping will need to be provided on site in compliance with Section 35 of <br />the Everett Zoning Code. The proposal is not anticipated to have adverse impacts on the <br />surrounding properiies. <br />6. The number, size and location of signs and lighting, especially as they relate to more <br />sensitive land uses. <br />Findings: No additional signage is proposed at this time. Any future change in siqnage would <br />require permits. <br />Conclusions: No adverse signage impacts are anticipated. <br />The landscaping, buffering and screening of parking, loading and storage areas. <br />Find(ngs: Landscaping is required on site consistent with Section 35 of the Everett Zoning <br />Code. A minimum of 10' of Type III landscaping is required along the properties frontage on <br />Colby. The drivelane to the north of the driveway cut is not required to be landscaped. A <br />minimum of 10' or the distance between the lot line and the building, should be landscaped with <br />Type III landscaping along the properties frontage on 52n0 Street. A minimum of 15' of Type II or <br />10' of Type I landscaping should be provided along the southern property line. <br />Conclusions: An approved landscape plan for the site is required prior to issuance of building <br />permits for the proposal. The plan must show the location, type and size of plantings to be <br />instalied on site. <br />