Laserfiche WebLink
FINAL DECLARATION Or NON -SIGNIFICANCE <br />d78-1_;� <br />Description of Proposal <br />The proposed action is the issuance of building permits to allow the construction of <br />approximately 15 condominium units on an approximately 22,500 square foot parcel. <br />The following factors were considered and the listed requirements were placed in <br />response to comments submitted during the environmental checklist review of this <br />proposal: <br />1. The proposed site is zoned R-3, multiple family low density residence zone, which <br />would allow this use. <br />2. Three single family residences which currently exist on the site must be <br />demolished to allow for construction. <br />3. Access is proposed via both Colby Avenue and the alley to the East of the site. Access, <br />circulation and parking design must be approved by the Public Works Department, <br />and standard asphalt alley improvements are required in conformance with Public <br />Works checklist comments. <br />4. Drainage must be designed in conformance with the City's Drainage Ordinance. Drai:age <br />retention must be provided. <br />5. Fire.Hydrants must be provided within 200 feet of all buildings. <br />6. Noise generated by traffic on'aajacent streets averages 67 dBA with peaks to <br />74 'dBA.. Buildings must be designed to conform with .state noise <br />interior noise levels (45 dBA). ' REsta for <br />Proponent _ _ -._ <br />King McCauley Homes, Inc. C4Tf�!t <br />7024 Evergreen Iday <br />Everett, Washington <br />Location of Proposal <br />_.r Coley (South er Conaway Motors) fEB 3 <br />l aloARency: City of Everett Planning Department <br />Contact Person: Bob Landles Phone: 259-8731 <br />This proposal has been determined not to have a significant adverse impact on the <br />environment. An Environmental Impact Statement is not required under KC4 43.21C.030 <br />(2)(c). This decision was made after review by the lead agency of a completed <br />environmental checklist and other information on file with the lead agency. <br />A fifteen day review period has elapsed for this project and no adverse comments were <br />received. <br />Responsible Official: Dennis Derickson fiJulIN : <br />-L mro�J�j/ .[/. <br />Title: Planning Director -Z SD H NR✓ • 17 <br />3 Ce i16 y <br />Date: ebruak�y 2, 1979 <br />---- <br />COORD <br />F'« �p�€ss 53d! �ol6y <br />NOTE: This final Declaration of Non -Significance may be withdrawn n the event <br />of significant changes in this proposal. <br />