My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/03/17 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/03/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2017 8:43:36 AM
Creation date
1/30/2017 8:43:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/17/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> EXHIBIT B <br /> ECS Engineering,Inc <br /> Fee Estimate Worksheet <br /> - .s 2/9/2004 <br /> P04110 <br /> Phase Description PR ENG. MG ENGR PROD.ENG. CS ENGR ENG. DRAFT W/P Total <br /> Rate $132 $110 $99 $89 $79 $75 $58 Costs <br /> Task 1-Project Design Components <br /> Kick-off meeting 4 $528 <br /> Review city documentation 8 $792 <br /> Design site visit 6 $594 <br /> Panama building single line 4 4 $696 <br /> Generator enclosure coordination assistance 4 $396 <br /> Design memo&prelim drawings(2) 16 8 2 $2,300 <br /> Design memo review meeting 4 4 $924 <br /> Detailed Drawings&specs: <br /> El—Electrical Symbols&Abbreviations 2 2 $348 <br /> E2—Vicinity and Electrical Site Plan 16 16 $2,784 <br /> E3—Single Line diagram and Load Calculations 16 16 $2,784 <br /> E4—Electrical Installation Sections,Elevations and Details 24 16 $3,576 <br /> Specifications 16 8 $2,048 <br /> 90%design submittal QC/QA&printing 4 2 2 2 $992 <br /> 90%submittal review meeting with City 4 45924 <br /> Incorporate review comments 16 8 2 $2,300 <br /> Bid documents QC/QA&printing 4 2 2 2 $992 <br /> Structural Sub Consultant $1,250 <br /> 5%Mark-up on sub $63 <br /> Sub-Total $24,291 I <br /> Task 2-Assistance During Construction <br /> Pre-bid walk through 4 $396 <br /> Bid phase questions&addendum 8 2 I $1,000 <br /> Bid evaluation 4 $396 <br /> Pre-con meeting 4 $396 <br /> Submittal Reviews 8 $792 <br /> 3 Site visits 12 <br /> $1,188 <br /> Punch-list&final 8 $792 <br /> Record drawings 8 8 $1,392 <br /> Sub-Total $6,352 I <br /> Task 3-Project Management <br /> Project Set-up/sub consultant coordination 4 2 $644 <br /> Progress invoices&sub tracking 8 8 $1,520 <br /> Project close out 1 2 $248 <br /> Sub-Total $2,412 I <br /> Task 4-Optional Services <br /> Provide services on an as-needed/as-approved <br /> basis 10 40 $5,280 <br /> Sub-Total $5,280 I <br /> Boor 1 otals 43 Z36 B4 29 392 <br /> .UB 101Ai, $38,335 <br /> MISC.EXPENSES $1,150 <br /> TOTAL $39,485 <br /> ECS ENGINEERING,INC. <br /> 2004 HOURLY RATES <br /> PRINCIPAL $13200 <br /> MANAGING ENGINEER $110.00 <br /> PROJECT ENGINEER $99.00 <br /> CONTROL SYSTEMS ENGINEER $89.00 <br /> ELECTRICAL ENGINEER $79.00 <br /> DRAFTING $75.00 <br /> ADMIN/WORD PROCESSING $58.00 <br /> Pagel 5 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.