My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/04/07 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/04/07 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2017 10:37:58 AM
Creation date
1/30/2017 10:37:27 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/7/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> SCOPE OF SERVICES <br /> City Of Everett, 41st Street Overcrossing: <br /> 41st Street Extension <br /> BACKGROUND <br /> The City has directed the Design Team to extend 41st Street SE to the south and <br /> reconfigure the intersection with the Temporary Access Road (TAR). Supplemental <br /> information and revisions to plans, quantities and estimate are required. <br /> Design and construction of a preload embankment with temporary walls at the roadway <br /> extensions and observation of the behavior of the underlying soils are required.. <br /> Additional landfill gas collection system, drainage system, illumination associated with <br /> the roadway extension are required. <br /> ASSUMPTIONS <br /> 1. The roadway will consists of four vehicle Ianes with a total width of 46 feet, 5-foot <br /> bike lanes and 6.5-foot sidewalks (including curb) for a total width of 69 feet <br /> (between interior faces of concrete barriers). <br /> 2. No major design chances are anticipated to the items listed in this assumption. Plans <br /> are generally anticipated to remain the same as shown in the Plans dated January <br /> 2004. <br /> • 41st Street SE (Station 8+57.60 to 25+00) <br /> • Temporary Access Road (Station 46+00 to 71+00) <br /> • S. 3td Avenue <br /> • NB I-5 On-Ramp <br /> 3. No update to the Design Report for the 41st Street Overcrossing will be done. <br /> 4. No changes will be made to the Channelizaton Plan for Approval. <br /> 5. Base specifications will be the WSDOT Standard Specifications for Road, Bridge and <br /> Municipal Construction, 2004. <br /> 6. No changes to the Landfill Gas EDR will be required. <br /> 7. No changes will be made to the landfill gas blower equipment, pad and discharge <br /> pipe. <br /> 8. Power and control wiring to new condensate pumps will be from Stormwater Pump <br /> Station Control Panel. <br /> 9. No changes will be made to the Storm water Pump Station design. <br /> 41'Street Overcrossing Page 1 2 0 <br /> Amendment#11, Attachment A: Scope of Work March 25.2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.