Laserfiche WebLink
10. No modifications will be made to the existing leachate collection system and pump <br /> station. <br /> TASKS: <br /> 1. Field Survey and Basemaps <br /> a. No additional work. <br /> 2. Geotechnical Engineering <br /> a. Initial coordination, planning, and set up for field exploration (field exploration <br /> not performed). <br /> b. Conduct engineering analyses for the various components of the 41st Street <br /> embankment extension preload. These components include retaining walls to <br /> retain the preload adjacent to the leachate collection system; and connection of the <br /> existing LPSB (low permeability soil barrier) with new LPSB. Perform estimates <br /> of settlements for the roadway extension and preload, and provide <br /> recommendations pertaining to installation of surface settlement plates, set forth a <br /> recommended schedule of monitoring of all instruments, and present criteria that <br /> may be used to determine when the preloading period may be considered <br /> complete. The results of these studies and engineering recommendations will be <br /> presented in a geotechnical addendum to the April 9, 2001, final geotechnical <br /> report. <br /> 3. Storm Drainage System Analysis <br /> a. Determine additional stormwater runoff generated from new improvements to the <br /> project. Calculate the water quality storm (6-month 24-hour storm) that will be <br /> collected and routed to a pump station for discharge. Review pump design and <br /> verify that currently specified pumps are adequate to accommodate additional <br /> runoff. <br /> b. Prepare an overall drainage schematic plan for the conveyance of surface water <br /> from proposed improvements. <br /> c. Prepare a technical memorandum outlining and recommending improvements as <br /> necessary to accommodate additional surface runoff. <br /> 4. Temporary Erosion & Sedimentation Control (TESC) Plan <br /> a. Update 1"ESC plans and supporting calculations to accommodate additional <br /> improvements. <br /> 21 <br /> 41s`Street Overcrossing Pace 2 <br /> Amendment#11.Attachment A: Scope of Work March 25,2004 <br />