Laserfiche WebLink
Washington State Department of Transportation Page 6 Six-year Transportation Improvement Program <br /> Agency Everett <br /> From 2005 to 2010 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs In Thousands of Dollars _ _ Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title - Ft/VU <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2005) (2006) (2007) 6th Type (MMM') <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 19 3 1 phase in project 12 P 00 C CN 7/1/2005 120 120 20 20 20 60' <br /> Local P <br /> Safety Roadway Hazard Elimination Projects-city-wide T <br /> Various locations within City limits O <br /> Various streets to Various streets <br /> Remove and/or modify roadside hazards Totals 120 120 20 20 20 60 <br /> 19 1 2 phases in project 7 S 0 0 PE 1/1/2005 <br /> Local CN 7/1/2005 6,000 6,000 1,000 1,000 1,000 3,000 <br /> Preserv./ Annual Street Overlay Program <br /> Mainten. Various streets within City limits <br /> Various streets <br /> Resurfacing streets _ Totals 6,000 6,000 1,000 1,000 1,000 3,000 <br /> 19 2 2 phases in project 6 S 00 0 PE 1/1/2005 <br /> Local CN 5/1/2005 360 360 60 60 60 180 <br /> Preserv./ Sidewalk repair and replacement <br /> Mainten. Various locations within City limits <br /> Various streets to Various streets <br /> Design,construct new and rehab.Existing sidewalks Totals _ 360 360 60 60 60 180 <br /> 19 3 2 phases in project 12 S 00 0 PE 1/1/2005 <br /> Local CN 5/1/2005 210 210 35 35 35 105 <br /> Preserv./ Pavement Marking Project <br /> Mainten. Various locations within City limits <br /> Various streets to Various streets <br /> Install pavement markings in various locations Totals 210 210 35 35 35 105 <br /> 19 1 3 phases in project 01 .. P 0.1 C PE 11/1/2004 85 85 <br /> Local S RW <br /> Street 106th Place SE Improvements G CN 4/1/2005 565 565 565 <br /> Constr. 106th Place SE P <br /> 16th Avenue SE to 19th Avenue SE(SR 527) T <br /> Design and construct street&signal improvements W Totals 850 850 565 <br /> 19 2 2 phases in project 01 P 0.4 C PE 1/1/2007 TIA 60 15 75 75 <br /> Local P CN 4/1/2008 TIA 500 100 600 600 <br /> Street 3rd Avenue SE Street Improvements T <br /> Constr 3rd Avenue SE O <br /> 92nd Street SE to 95th Street SE <br /> Design and construct street improvements Totals 560 115 675 75 600 <br /> 19 3 2 phases in project 05 P 0.28 C PE 7/1/2008 80 80 80 <br /> Local P CN 5/1/2009 500 500 500 <br /> Street Pine Street Improvements T <br /> Constr. Pine Street Improvements O <br /> Everett Avenue to Hewitt Avenue <br /> Design and construct street improvements Totals 580 580 580 <br />