My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5494
>
Resolutions
>
Resolution 5494
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2017 10:54:17 AM
Creation date
1/31/2017 10:53:53 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5494
Date
6/25/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Department of Transportation Page 7 Six-year Transportation Improvement Program <br /> Agency Everett From 2005 to 2010 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars __ Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> 9 cY <br /> C. Project Title - - -----R/W <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thin Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2005) (2006) (2007) 6th Type (M M/Y1')_ <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 19 4 2 phases in project 05 P 1.7 C PE 8/1/2008 50 50 50 <br /> Local P CN 6/1/2009 250 250 250 <br /> Street Upper Ridge&Lower Ridge Rd.street improvemt. T <br /> Constr. Upper Ridge,Lower Ridge,74th St.,76th St O <br /> Beverly Lane to 78th Street <br /> Design and construct street Improvements Totals 300 300 300 <br /> 19 1 1 phase in project 12 P 00 C CN 5/1/2005 240 240 40 40 40 120 <br /> Local Traffic Signal Interconnect P <br /> Traffic Various locations within City limits T • <br /> Signal Various streets to Various streets O <br /> Construct traffic signal interconnect Totals 240 240 40 40 40 120 <br /> 19 2 2 phases in project 12 S 00 C PE 1/1/2005 <br /> Local Traffic Signal Improvements(City-wide) P CN 6/1/2005 900 900 150 150 150 450 <br /> Traffic Various locations within City limits T <br /> Signal Various streets to Various streets <br /> Design,construct,install traffic signals Totals 900 900 150 150 150 450 <br /> 19 3 2 phases in project 12 P 0 0 PE 1/12006 STP(U) 500 100 600 600 CE <br /> Local ITMS Upgrades CN 4/1/2007 STP(U) 870 130 1,000 500 500 No <br /> Traffic various locations city-wide <br /> Signal various traffic signals in Everett <br /> replace central system with ITMS compat.System Totals 1,370 230 1,600 600 500 S00 <br /> 19 1 2 phases in project 8 S 00 C PE 1/1/2005 <br /> Local Neighborhood Block Grants P CN 9/1/2005 CDBG 360 360 60 60 60 180 No <br /> Neighbor. Various locations within City limits T <br /> Projects Various streets to Various streets O <br /> Construct improvements in various neighborhoods Totals 360 360 60 60 60 180 <br /> 19 2 2 phases in project E P W C PE 171/2uob <br /> Local Neighborhood Traffic Mitigation Studies-Projects P CN 5/1/2005 2,400 2,400 400 400 400 1,200 <br /> Neighbor. Various locations within City limits T I <br /> Projects Various streets O <br /> Install traffic enhancements in Neighborhoods _ - Totals 2,400 2,400 400 400 400 1,200 <br /> 19 1 2 phases in project 06 S 00 P PE 3/1/2005 30 30 5 5 5 15 <br /> Local 0 CN 7/1/2005 150 150 25 25 25 75 <br /> Landscap. City Entryway Landscaping and Signs <br /> Various Entryway Corridors within City limits <br /> Various Entryway to Various Entryway <br /> Design and Install Gateway landscaping and signs Totals 180 180 30 30 30 90 <br /> 19 1 3 phases in project 32 S 0.3 C PE 4/1/2003 STPE 30 20 50 CE <br /> Non- Interurban Trail Completion T CN 6/1/2004 STPE 200 50 250 250 5/1/2004 <br /> Motorized Colby Avenue 0 <br /> 44th Street to 41st Street <br /> Design and construct bike&ped improvements Totals 270 80 350 250 <br />
The URL can be used to link to this page
Your browser does not support the video tag.