|
CITY OF EVERETT'2005 TO 2010 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
<br /> Project PROJECT PRIO- PE R/W CONST. Est.2005-10 LEAD MAP
<br /> Number TYPE RITY PROJECT NAME TERMINI START START START Expenditures AGENCY NO.
<br /> 1 Interstate 1 1-5 Median HOV Lanes&Auxiliary Lanes _SR 526 to US 2 Jan.99 Nov.05 May.07 230.000,000 WSDOT _1_
<br /> 2 Interstate 2 1-5-41st Street interchange 41st Street to US 2 Jul.03 Jan.05 Jul.06 44,135,000 • EVERETT 2
<br /> 3 Interstate 3 I-5 112th Street SE Direct Access HOV/PNR/Flyer Stops I-5 at 112th Street SE Jan.02 Jul.05 Jul.06 22,600,000 ST&WSDOT 3
<br /> 4 Interstate 4 1-5 Downtown interchange improvements Pacific Avenue to Everett Avenue Jan.07 Jun.09 Sep.10 44,500.000 • EVERETT _ 4
<br /> 5 Interstate 5 I-5/100th Street SE HOV access/undercross 1-5 at 100th Street SE Jul.09 Jan.10 Jan.11 57,000,000 • EVERETT 5
<br /> 6 Interstate 6 NB Everett Mall Way to SB I.5 Onramp Everett Mall Way to I.5 Jul.09 Jan.10 Jan.12 12,000,000 • WSDOT 6
<br /> 7 Interstate 7 1-5/Smith Island Interchange 12th Ave.NE or north of 12th Ave. Jan.08 Jun.09 Jul.10 25.000,000 • EVERETT 7
<br /> 8 Interstate 8 1-5/East Marine View Drive Interchange I-5 at East Marine View Drive Jan.09 Jun.10 Jun.12 35,000,000 • EVERETT 8
<br /> 9 Freeway 1 US 2 Improvements I-5 to SR 204 Jun.09 Jun.10 Jun.12 323,000,000 • WSDOT 9
<br /> 10 Freeway 2 SR 526/Hardeson Road Interchange SR 526/Hardeson Road Jun.09 Jun.10 Jun.12 38,000,000 • WSDOT 10
<br /> 11 Principal Arterial 1 19th Avenue SE(SR 527)Improvements 110th Street SE to 132nd Street SE Mar.94 Jul.98 Jun.04 15,000,000 WSDOT 11
<br /> 12 Principal Arterial 2 East Marine View Drive Improvements North Broadway to Interstate 5 Mar.03 Jun.05 Jul.06 10,400,000 • EVERETT _ 12
<br /> 13 Principal Arterial 3 Broadway I Beverly Blvd.Intersection Impr. So.Broadway at Beverly Blvd. Oct.04 Jun.05 750.000 EVERETT 13
<br /> 14 Principal Arterial 4 Evergreen Way Improvements,115th to Airport Road 11500 block to Airport Road Jan.99 Jul.08 500.000 • EVERETT 14
<br /> 15 Principal Arterial 5 Broadway Corridor Improvements SR 526 to 41st Street Feb.11 Feb.12 Jun.14 33,274,000 • EVERETT 15
<br /> 16 Principal Arterial 6 HES Projects(Brdwy at 52nd&at Madison,Forest Pk entrances) Ev.Mall Wy.,Broadway,Colby Ave. Jan.06 Mar.07 900,000 • EVERETT _
<br /> 17 Principal Arterial 7 Arterial Needs Study Various arterials within city limits Feb.05 200,000 • EVERETT
<br /> 18 Principal Arterial 8 Arterial Streetscaping Improvements Various arterials within city limits Feb.05 Apr.07 400,000 • EVERETT
<br /> 19 Minor Arterial 1 41st Street Overcrossing '41st Street at So.3rd Avenue Jan.99 Sep.99 Jun.01 9,200.000 EVERETT 16
<br /> 20 Minor Arterial 2 112th Street SE Improvements 3rd Avenue SE to Interstate 5 Jun.03 Sep.03 Jun.04 4,200,000 • EVERETT 17
<br /> 21 Minor Arterial 3 112th Street SE I-5 Bridge Widening 112th Street at Interstate 5 Jan.01 Sep.02 Feb.06 9,800,000 • EVERETT 18_
<br /> 22 Minor Arterial 4 112th Street SE Improvements _ Interstate 5 to 19th Avenue SE Jan.06 Mar.07 Jul.08 _ 4,950,000 • EVERETT 19
<br /> 23 Minor Arterial 5 Lowell Neighborhood Bypass 41st Street to Lowell River Road Jan.06 Jul.07 7,000.000 • EVERETT 20_
<br /> 24 Minor Arterial 6 116th Street SE Improvements SR 527 to 35th Avenue SE Jan.06 Jul.07 May.08 3,800,000 • EVERETT 21
<br /> 25 Minor Arterial 7 100th Street SW Improvements Airport Road to Evergreen Way Feb.06 Jun.07 2,600,00 • EVERETT 22
<br /> 26 Minor Arterial 8 Casino Road at Hardeson Road Intersection Improvements Casino Road at Hardeson Road Mar.08 Mar.09 May.10 500,000 • EVERETT 23
<br /> 27 Minor Arterial 9 4th Avenue West widening and Improvement 104th Street to 112th St.SW Jan.07 Jan.08 May.09 9,000,000 • SNO.CNTY.__ 24
<br /> 28 Minor Arterial 10 Colby Avenue Streetscape improvements 19th Street to 41st Street Feb.06 May.08 3,000,000 • EVERETT 25
<br /> 29 Collector Arterial 1 Holly Drive Non-Motorized Improvements 100th Street SW to Airport Road Apr.02 Sep.03 Oct.04 2,688,000 EVERETT 26
<br /> 30 Collector Arterial 2 36th Street Ped,Bike&Lndscp.Improv. Broadway to Smith Avenue Jan.06 May.07 400,000 • EVERETT 27
<br /> 31 Collector Arterial 3 East Everett Ave./BNSF Overcrossing East Grand Ave.to Railway Ave. Jan.07 Jun.08 10,000,000 • EVERETT 28
<br /> 32 Collector Arterial 4 37th Street improvements and traffic signal Rucker Avenue to Wetmore Ave. Jun.06 Jun.07 500,000 • EVERETT 29_
<br /> 33 Collector Arterial 5 Smith Island Bike/Ped Improvements Various arterials on Smith Island Jan.06 Jan.07 May.08 1,000,000 • EVERETT 30
<br /> 34 Collector Arterial 6 Silver Lake Road-121st St.SE Ped.Improv. 112th Street to SR 527 Jun.06 Jun.07 Jul.08 500,000• EVERETT 31
<br /> 961,797,000
<br /> * A portion or all of the funding for this project has not yet been committed.
<br /> NOTE: Projects shown in bold type were not included in the 2004-2009 Six-Year TIP.
<br />
|