|
CITY OF EVERETT 2005 TO 2010 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
<br /> Project PROJECT PRIO- PE RNV CONST. Est.2005-10 LEAD MAP
<br /> Number TYPE RITY PROJECT NAME TERMINI START START START Expenditures AGENCY NO.
<br /> 35 Local Access-SAF 1 BNSF RR track relocation Pacific Avenue to Lowell Junction Jan.02 Jun.05 Jun.06 6,500,000 EVERETT 32
<br /> 36 Local Access-SAF 2 BNSF RR safety improvements Various railroad crossings in Everett Jan.04 Jun.05 550,000 EVERETT _
<br /> 37 Local Access-SAF 3 Roadway Hazard Elimination Projects Various locations within city limits Jul.04 Sep.05 120,000• EVERETT
<br /> 38 Local Access-PRIM 1 Annual Street Overlay Program Various streets within city limits Jan.05 Ju1,05 6,000,000 EVERETT
<br /> 39 Local Access-PRIM 2 Sidewalk repair and replacement Various locations within city limits May.05 360,000 EVERETT
<br /> 40 Local Access-PRIM 3 Pavement Marking Project Various locations within city limits Jan.05 May.05 210,000 EVERETT
<br /> 41 Local Access-STR 1 106th Place SE Improvements 16th Avenue SE to 19th Avenue SE Nov.04 Jun.05 650,000• EVERETT 33
<br /> 42 Local Access-STR 2 3rd Avenue SE Street Improvements 92nd Street SE to 95th Street SE Jan.07 Apr.08 675,000• EVERETT 34
<br /> 43 Local Access-STR 3 Pine Street Improvements Everett Avenue to Hewitt Avenue Jul.08 May.09 580,000* EVERETT , 35
<br /> 44 Local Access-STR 4 Upper&Lower Ridge Rd.Str.Improv. . 74th Street to 78th Street Aug.08 Jun.09 300,000• EVERETT 36
<br /> 45 Local Access-SIG 1 Traffic Signal Interconnect Various locations within city limits May.05 240,000 EVERETT
<br /> 46 Local Access-SIG 2 Traffic Signal Improvements Various locations within city limits Jan.05 Jun.05 900,000 EVERETT
<br /> 47 Local Access-SIG 3 ITMS Upgrades Various signals in Everett Jan.06 Apr.07 1,600,000• EVERETT
<br /> 48 Local Access-NEI 1 Neighborhood Block Grants Various locations within city limits Jan.05 May.05 360,000• EVERETT
<br /> 49 Local Access-NEI 2 Neighb.Traffic Mitig.Studies&Projects Various locations within city limits Jan.05 May.05 2,400,000• EVERETT
<br /> 50 Local Access-LS 1 City Entryway Landscaping and Signs Various entry corridors into the City Mar.05 Jul.05 180,000 EVERETT
<br /> 51 Local Access-NM 1 Interurban Trail,Northern Extension 44th Street to 41st Street Mar.03 Jun.04 350,000 EVERETT 37
<br /> 52 Local Access-NM 2 Riverfront Walkway Overcrossing Riverfront Walkway at BNSF Overcrossing Jan.99 May.05 500,000 EVERETT
<br /> 53 Local Access-NM 3 Riverfront Walkway Phase 1 Lenora Street to Pacific AvenueJan.99 May.05 55,000 EVERETT
<br /> 54 Local Access-NM 4 41st Street Bike-Ped.Connector Interurban Trail to Riverfront Walkway Jan.05 Dec.07 1,700,000• EVERETT 38
<br /> 55 Local Access-NM 5 Terminal Ave.Ped.Improvements California Street to Bond Street Jun.02 Aug.04 110,000• P.O.E. 39
<br /> 56 Local Access-NM 6 Henry Jackson Park Ped Bridge E.Marine View Drive to Riverside Bus.Park Jan.04 May.05 Jul.06 2,700,000* EVERETT 40
<br /> 57 Local Access-NM 7 Riverside Business Park Ped trail Snohomish River at Riverside Business Park Apr.05 Apr.06 700,000• EVERETT 41
<br /> 58 Local Access-NM 8 West Marine View Drive Bike-Ped Separation 22nd Street to California Street Overcrossing Apr.06 Apr.07 150,000• EVERETT 42
<br /> 59 Local Access-NM 9 West/East Marine View Drive Bike-Ped Separation Alverson Bridge to North Broadway Apr.06 Apr.07 250,000• EVERETT 43
<br /> 60 Local Access-NM 10 Port of Everett Public Access Wlkwy. Bond Street to Pigeon Creek No.1 Jun.04 Jun.05 200,000• POE 44_
<br /> 61 Local Access-NM 11 Pigeon Creek No.1/BNSF Crossing Port of Everett Public Access Walkway to Pigeon Crk Rd Jan.06 Jul.07 Apr.08 425,000• EVERETT 45
<br /> 62 Local Access-NM 12 Shoreline Access Improvements Various locations within city limits Apr.05 Apr.06 6,000,000• EVERETT _
<br /> 63 Local Access-NM 13 Snohomish River Bike and Ped.Bridge E.Marine View Drive to Smith Island Nov.01 Apr.09 9,000,000• EVERETT 46
<br /> 64 Local Access-NM 14 Everett Non-Motorized Projects•• Various locations within city limits May.05 Sep.06 1,300,000• EVERETT
<br /> **Candidate non-motorized improvements include Norton Avenue,Olympic Drive,Smith Avenue,Wall Street, 45,065,000
<br /> Bond Street,Lowell River Road,36th Street,Sharon Drive,Friday Avenue,Lowell Road-Lenora Street,90th Street SW,
<br /> 93rd Street SW,Dom Avenue-92nd Street SE,7th Avenue SE,3rd Avenue SE,Dakota Way,Hollowdale Place,Cady Road,
<br /> Fleming Street,75th Street,100th Street SW,and various shoreline public access projects
<br /> A portion or all of the funding for this project has not yet been committed. NOTE: Projects shown in bold type were not included in the 2004-2009 Six-year TIP.
<br /> Local Access Codes: SAF=Safety; PRIM=Preservation and Maintenance; STR=Street construction; SIG=Traffic Signal Improvement;
<br /> NEI=Neighborhood Projects; LS=Landscaping Project; NM=Non-Motorized Improvement
<br />
|