Washington State Department of Transportation Page 4 Six-year Transportation Improvement Program
<br /> Agency Everett From 2005 to 2010
<br /> County No. 31 Hearing Date
<br /> City No. 420 Adoption Date
<br /> MPO PSRC Resolution No.
<br /> Project Identification Project Costs in Thousands of Dollars Federally Funded
<br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only
<br /> B. Bridge No. Federal Funding Local Agency
<br /> C. Project Title
<br /> RNV
<br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required
<br /> Functional Priority E. Beginning MP or road-Ending MP or road meet Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd ' thru Envir. Date
<br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2005) (2006) (2007) 6th Type (MM/YY)
<br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
<br /> 16 5 HP-1998(015) 2 phases in project 1 S,P 1.1 S PE 9/1/2006 RTID 1,000 1,000 1,000
<br /> Minor P CN 6/1/2007 RTID 6,000 6,000 3,000 3,000 EA No
<br /> Arterial Lowell Neighborhood Bypass
<br /> Lowell Neighborhood Bypass
<br /> 41st Street to Lowell River Road
<br /> Construct new minor arterial street Totals 7,000 7,000 1,000 3,000 3,000
<br /> 16 6 3 phases in project 4 P 0.9 C PE 5/12006 TIA 360 120 480 480
<br /> Minor Joint project with Sno.County-(County Lead) P RW 7/1/2007 TIA 387 129 516 516
<br /> Arterial 116th Street SE Improvements T CN 5/1/2008 TIA 2,060 744 2,804 2,804
<br /> 116th Street SE S
<br /> SR 527 to 35th Avenue SE W
<br /> Design,construct 3 lane street with bike&ped improv. G Totals 2,807 993 3,800 480 516 2804
<br /> 16 7 2 phases in project 4 P 1 C PE 2/12006 , TIA 252 84 336 336
<br /> Minor P CN 6/1/2007 TIA 1,660 604 2,264 2,264
<br /> Arterial 100th Street SW Improvements T
<br /> 100th Street SW 0
<br /> Airport Road to Evergreen Way
<br /> Design,construct road widening&other Improvements Totals 1,912 638 2,600 336 2,264
<br /> 16 8 3 phases in project 6 P 0.1 C PE 3/1/2008 75 75 75
<br /> Minor P RW 3/1/2009 50 50 50
<br /> Arterial Casino Rd.at Hardeson Intersec.Improv. T CN 5/1/2010 375 375 375
<br /> Casino Rd./Hardeson Rd. W
<br /> Intersection of Casino/Hardeson Rd. S
<br /> Design,construct Intersection improvements G Totals 500 500 0 500
<br /> 16 9 3 phases in project 4 P 0.5 C PE 1/1/2007 RTID 1,500 1,500 1,500
<br /> Minor Sno.Co.is lead agency P RW 1/1/2008 RTID 2,000 2.000 2,000
<br /> Arterial 4th Avenue West Widening/Improvement T CN 5/1/2009 RTID 5,500 5,500 5,500
<br /> 4th Avenue West W
<br /> 112th Street SW to 104th St.SW S
<br /> Design,construct street improvements G Totals 9,000 9,000 1,500 7,500
<br /> 16 10 2 phases in project 6 P 2 C PE 2/1/2006 300 300 300
<br /> Minor P CN 5/1/2008 2,700 2,700 2,700
<br /> Arterial Colby Avenue Streetscape Improvements T
<br /> Colby Avenue W
<br /> 19th Street to 41st Street S
<br /> Design,construct streetscape improvements G Totals 3,000 3,000 300 2,700
<br /> 17 1 2 phases In project 32 S 1 C PE 4/1/2002 CMAQ 291 45 336
<br /> Collector P RW 9/1/2003 CMAQ 284 44 328 CE Yes
<br /> Arterial Holly Drive Non-Motorized Improvements T CN 10/31/2004 CMAQ 325 AIP 149 462 936 936
<br /> Holly Drive Non-Motorized Improvements O CN STP(N) 88 88 88 6/1/2004
<br /> 100th Street SW to Airport Road CN STP(U) 1,000 1000 1000
<br /> Design and construct pedestrian improvements Totals 1988 149 551 1,600 20241