Laserfiche WebLink
• <br /> Washington State Department of Transportation Page 3 Six-year Transportation Improvement Program <br /> Agency Everett <br /> From 2005 to 2010 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title RAN <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2005) (2006) (2007) 6111 Type (MM/YY) <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 14 6 2 phases in project 12 S 00 C PE 1/1/2006 STP(S) 135 135 135 CE <br /> Principal P CN 3/1/2007 STP(S) 765765 765 No <br /> Arterial (HES)Projects(Broadway/52nd St.;S.Broadway • T <br /> at 52nd St.&at Madison St.;entrances to Forest 0 <br /> Park on Mukilteo Boulevard) <br /> Various safety,signal related improvements .. _ Totals 900 900 -- <br /> 14 7 1 phase in project 31 P 0 PE 2/1/2005 200 200 P00 <br /> Principal No <br /> Arterial Arterial Needs Studies <br /> Various Arterials within City Limits <br /> N/A to N/A <br /> Study improvement needs-various classes of arterials Totals 200 200 200 <br /> 14 8 2 phases in project 31 P 0 PE 2/1/2006 25 25 200 25 <br /> Principal CN 4/1/2007 175 175 175 No <br /> Arterial Arterial Streetscaping Improvements <br /> Various Arterials within City Limits <br /> N/A to N/A <br /> Streetscaping improvements-various Basses of arterials Totals 200 200 200 25 175 <br /> 16 1 HP-1998(015) 3 phases in project 8 S 0.3 C PE 1/1/1999 DEMO 1,120 280 1,400 500 <br /> Minor P RW 9/30/1999 DEMO PWTF 1,000 800 1,800 EA <br /> Arterial 41st Street Overcrossing T CN 6/30/2001 DISC 6,728 FMSIB 3,000 1,658 11,386 8,673 Yes <br /> 41st Street 0 CN 6/30/2001 STP(U) 1,457 1,457 <br /> 1-5 interchange to Landfill site S CN 6/30/2001 STP(E) 457 457 6/1/2001 <br /> Design and construct railway overcrossingW Totals 9,762 4,000 2,738 16,500 9,173 _ <br /> 16 2 3 phases in project 4 S 1 C PE 1/1/2002 TIA 236 236 472 <br /> Minor P RW 5/1/2003 TIA 500 500 1,000 <br /> Arterial 112th Street SE Improvements T CN 6/302004 TIA 1,338 1,338 2,676 1,676 <br /> 112th Street SE 0 <br /> 3rd Avenue SE to west side 1-5 R-O-W S <br /> Design,construct 5 lane street with bike&ped improv. W Totals 2,074 2,074 4,148 1,676 <br /> 16 3 2 phases in project 4 S 1 C PE 1/1/2002 TIA 679 796 1,475 250 <br /> Minor P RW TIA 46 54 100 <br /> Arterial 112th Street SEI-5 bridge widening T CN 7/1/2006 TIA 3,775 4,436 8,211 3,500 3,971 <br /> 112th Street SE 0 <br /> 112th Street SE at Interstate 5 S <br /> Design,construct 5 lane street with bike&ped improv. W Totals 4,500 5,286 9,786 250 3,500 3,971 <br /> 16 4 3 phases in project 4 S 1 C PE 1/1/2006 RTID 800 800 800 <br /> Minor P RW 5/1/2007 RTID 950 950 950 <br /> Arterial 112th Street SE Improvements T CN 5/1/2008 RTID 3,200 3,200 3,200 <br /> 112th Street SE 0 <br /> East side I-5 R-O-W to SR 527(19th Ave.SE) S 4,950 0 4,950 600 950 3,200 <br />