My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/05/05 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/05/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 8:31:40 AM
Creation date
2/1/2017 8:30:42 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/5/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA I I EM COVER SI 'f <br /> " PROJECT TITLE: <br /> Professional Services Agreement with Consent COUNCIL BILL# <br /> . Brown&Caldwell for Design of X Action Originating Department Utilities <br /> Chlorine Building Replacement at the First Reading Contact Person John McClellan <br /> Water Filter Plant Second Reading Phone Number 257-7214 <br /> Third Reading FOR AGENDA OF <br /> Public Hearing <br /> Initialed by: <br /> Department Head L�_` <br /> CAA �...- <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Water Filter Plant at Contract for Engineering Professional Services Utilities <br /> Chaplain Reservoir Study Agreement <br /> Council approval of this agenda item authorizes a budget revision in the additional amount requested. <br /> Expenditure Required $ 348,167 Account Number(s): <br /> Amount Budgeted $ 2,650,000 <br /> Additional Required $ -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Brown & Caldwell consulting engineers has recently completed an engineering study of drinking water <br /> disinfection alternatives for the water filter plant (Disinfection Facilities Investigation for Replacement of the <br /> Existing Chlorine System and Building at the Everett Water Filtration Plant, January 2004). Based on the <br /> study,the department wishes to proceed with the design and construction of a new disinfection facility using <br /> sodium hypochlorite as the disinfectant. This will allow the water filter plant to prepare for increased <br /> demand and expansion, and to eliminate the management and handling of 1-ton compressed chlorine gas <br /> cylinders, which are currently used for disinfection of drinking water produced by the plant. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign the Professional Services Agreement with Brown & Caldwell for$348,167 to <br /> perform engineering services to design the new disinfection facility and provide assistance during bidding <br /> and construction activities. <br /> • <br /> S .1\kaki11 P-?19?-WFP_(hirrincBW;I P-=I9F_('(A-(Monne Jo: <br /> . m <br />
The URL can be used to link to this page
Your browser does not support the video tag.