Laserfiche WebLink
10 <br /> This Agreement shall not be construed as an assumption by the County,the City or OPL of <br /> any authority, responsibility or liability with regard to the design,construction, repair, <br /> maintenance, or operation of PSE's electric transmission lines nor shall the design, <br /> construction, repair, maintenance, or operation of the electric transmission lines be considered <br /> a joint undertaking, partnership,or joint venture by PSE and the County,the City or OPL. <br /> City Water Transmission Line. The City owns and operates Water Transmission Line <br /> No.5 located within easements crossing property owned by the County within former <br /> Drainage District No. 6 in Snohomish County. The City retains sole authority and <br /> responsibility for the design,construction, repair,maintenance, and operation of its water <br /> transmission line before,during and after the maintenance activities undertaken pursuant to <br /> this Agreement. This Agreement shall not be construed as an assumption by the County, <br /> PSE or OPL of any authority, responsibility or liability with regard to the design,construction, <br /> repair, maintenance, or operation of the City's water transmission line nor shall the design, <br /> construction,repair, maintenance,or operation of the water transmission line be considered a <br /> joint undertaking, partnership,or joint venture by the City and the County, PSE or OPL. <br /> OPL Petroleum Pipeline. OPL owns and arranges for the operation of a petroleum <br /> pipeline located within easements crossing property adjacent to property owned by the <br /> County within former Drainage District No. 6 in Snohomish County. OPL and its operator, <br /> currently BP Pipelines(NA), retain authority and responsibility for the design, construction, <br /> repair, maintenance, and operation of its petroleum pipeline before, during and after the <br /> maintenance activities undertaken pursuant to this Agreement. This Agreement shall not be <br /> construed as an assumption by the County, the City or PSE of any authority, responsibility or <br /> liability with regard to the design, construction, repair, maintenance, or operation of OPL's <br /> petroleum pipeline nor shall the design, construction, repair, maintenance,or operation of the <br /> petroleum pipeline be considered a joint undertaking, partnership, or joint venture by OPL and <br /> the City, the County or PSE. <br /> County Property. The County owns real property located within former Drainage <br /> District No. 6 in Snohomish County. Located upon this property are flood control and <br /> associated drainage facilities constructed by the former Drainage District. The County's <br /> property is subject to easements granted to PSE and the City for their electric and water <br /> transmission lines respectively. - - <br /> 2. TASKS COVERED BY THIS AGREEMENT <br /> The Tasks performed under this Agreement shall be broken into three classifications: a.)short <br /> term maintenance, b.)on-going maintenance, and c.)unforeseen or catastrophic failures <br /> (collectively referred to herein as"Tasks"). <br /> A. Short term maintenance. Consistent with an inspection of the Facilities on September 22, <br /> 2003 by Snohomish County,the following maintenance will be undertaken in the corresponding <br /> time frames: <br /> • Cross-dike culvert and tidegate. This pipe is partially rusted through the bottom, allowing <br /> water to enter at high tide. Pipe should be replaced, or slip lined to prevent water <br /> entering the landside ditch behind the dike. <br /> Estimated cost for full replacement: $80,000 <br /> Estimated time for completion of task if work commences by 8/30/04: 9/30/04 <br /> Cost Share Agmt Final.doc Page 2 <br /> 81 <br />