My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/05/19 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/05/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 9:10:42 AM
Creation date
2/1/2017 9:10:00 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: <br /> Change Order no. <br /> Change Order Effective Date: <br /> Item#25—Connection to Drainage Structure. Amend the contract to add one each connection to <br /> drainage structure to the contract. <br /> Item#27—Drop Manhole Connection. Amend the contract to deduct 13 linear feet of drop manhole <br /> connection from the contract. <br /> Item#71—Concrete Storm Inlet. Amend the contract to add two each concrete storm inlets to the <br /> contract. <br /> Item#72—Catch Basin,Type B. Amend the contract to deduct one each catch basin,type B from the <br /> contract. <br /> Item#73—Asphalt Lip Curb. Amend the contract to deduct 732 linear feet of asphalt lip curb from the <br /> contract. <br /> Item#74—12-Inch Drop Manhole Connection. Amend the contract to deduct one each 12-inch drop <br /> manhole connection from the contract. <br /> Item#75—Type II,Catch Basin,54-Inch Diameter with Gas Trap&Floatable Material Separator. <br /> Amend the contract to add one each type II,54-inch diameter catch basin with gas trap&material separator <br /> to work order 2857A from work order 2857. <br /> Item#76—Type II Catch Basin,48-Inch Diameter. Amend the contract to add one each type II 48-inch <br /> diameter catch basin to work order 2857A. <br /> Items being added by this change order are listed below. <br /> Work Order 2857 <br /> Item#78—Storm Sewer Pipe,8-inch Diameter. Add a new bid item to the contract for 459 linear feet of <br /> 8-inch diameter storm sewer pipe,with a renegotiated unit price of$38.00 per linear foot. <br /> Item#79—Storm Sewer Pipe,12-inch Diameter. Add a new bid item to the contract for 639 linear feet <br /> of 12-inch diameter storm sewer pipe,with a renegotiated unit price of 47.50 per linear foot. <br /> Item#80—Fence,Type 6,Black Vinyl Coated. Add a new bid item to the contract for the installation of <br /> 120 linear feet of type 6,black vinyl coated chain link fence installed along Alta Drive at the agreed lump <br /> sum price of$2,390.00. <br /> Item#81—Roadway Excavation Including Haul. Add a new bid item to the contract for 2,358.23 cubic <br /> yards of roadway excavation including haul with a renegotiated unit price of$13.50 per cubic yard. <br /> Item#82—Crushed Surfacing Top Course. Add a new bid item to the contract for$4,136.04 tons of <br /> crushed surfacing top course with a renegotiated unit price of$17.00 per ton. <br /> Item#83—Remove Existing Paint Stripe. Add a new bid item to the contract for 5,673 linear feet <br /> remove existing paint striping at a unit bid price of$0.40 per linear foot. <br /> Item#84—Painted Crosswalk. Add a new bid item to the contract for 377 linear feet of painted <br /> crosswalk at a unit price of$2.50 per linear foot. <br /> Item#85—Plastic Crosswalk&Stop Bar Removal. Add a new bid item to the contract for 206 square <br /> feet of plastic crosswalk&stop bar removal at a unit price of$2.25 per square foot. <br /> Item#86—Hydroseeding. Add a new bid item to the contract for 1,450.00?square yards of hydroseeding <br /> at the renegotiated unit price of$2.50 per square yard. <br /> B. Justification of the items being amended or added by this change order <br /> Item#3—Traffic Control Labor. Additional hours of traffic control labor were required to complete the <br /> work on the project. <br /> Item#6—Roadside Cleanup. The$5,000.00 set aside in the bid proposal for this work effort was not <br /> used.Only$524.25 of the$5,000.00 was. <br /> Item#9—Existing Private Improvement Restoration. The$10,000.00 set aside in the bid proposal for <br /> this work effort was not used.Only$5,869.49 of the$10,000.00 was. <br /> Exhibit A <br /> Page 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.