My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/06/02 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/06/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 9:43:00 AM
Creation date
2/1/2017 9:42:27 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/2/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA 17'EM COVER SHEET 4 <br /> PROJECT TITLE: <br /> Amendment to the Professional Consent COUNCIL BILL# <br /> Service Agreement with URS X Action Originating Department PW/Utilities - <br /> Corporation for predesign First Reading Contact Person Jenifer Galatas <br /> engineering services for the"Water Second Reading Phone Number (425)257-7215 <br /> Transmission Pipelines River and Third Reading FOR AGENDA OF June 2,2004 <br /> Slough Crossings"Project. Public Hearing <br /> Initialed by: <br /> Department Headj, i� <br /> CAA <br /> Council Presiden <br /> Location Preceding Action Attachments Department(s) Approval <br /> See Attached Project Mayor Authorized the Amendment <br /> Location Map Professional Services Project Location Map <br /> Agreement with URS <br /> Corporation in May 2004. <br /> Council approval of this agenda item authorizes a budget revision in the additional amount requested. <br /> Expenditure Required $ 83,125.00 Account Number(s): UP 3148 <br /> Amount Budgeted $ 300,000 <br /> Additional Required $ -0- <br /> DETAILED SUMMARY STATEMENT: <br /> This project will survey,evaluate and recommend improvements for five partially exposed Water <br /> Transmission Pipeline River and Slough Crossings: <br /> • Pipeline 4 at the Snohomish River and Ebey Slough <br /> • Pipeline 5 at the Snohomish River, Ebey Slough,and Pilchuck River <br /> Of particular concern is the Pipeline 5 crossing of the Snohomish River. An underwater survey shows that <br /> part of the pipeline is fully exposed and trapping debris. Due to the severity of the exposure and presence of large <br /> woody debris, Staff decided that this pipeline crossing should be immediately evaluated to determine if it meets the <br /> criteria of an emergency repair. The remaining four crossings(Pipeline 4 at Snohomish River and Ebey Slough and <br /> Pipeline 5 at Ebey Slough and Pilchuck River) are also partially exposed and being evaluated at the same time. <br /> The Mayor signed a Professional Services Agreement with URS Corporation in the amount of <br /> $74,975.00 in May 2004. This Agreement allowed URS to begin topographic survey, data collection and Hydraulic <br /> analysis. This amendment adds additional Hydraulic and Geomorphic analysis needed to complete the evaluation of <br /> the Water Transmission Pipeline Crossings. The expenditure requested to date(including this amendment)totals <br /> $158,100. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign an Amendment with URS Corporation in the amount of$83,125 for predesign <br /> engineering services for the Water Transmission Pipelines River and Slough Crossings Project. <br /> S:'JGalatas Pipelines Contract Amendment 1060204 Agenda Item.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.