Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA HEM COVER SHEET I ' <br /> _PROJECT TITLE: <br /> Call for Bids for Construction of the X Consent COUNCIL BILL# <br /> Portal 3 Relocation Project Action Originating Department Utilities <br /> First Reading Contact Person John McClellan <br /> Second Reading Phone Number 257-7214 <br /> Third Reading FOR AGENDA OF July 2, 2004 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President 14f <br /> Location Preceding Action Attachments Department(s) Approval <br /> Chaplain Reservoir Consultant Design Advertisement for Bids Utilities <br /> Contract <br /> Council approval of this agenda item authorizes a budget revision in the additional amount requested. <br /> Expenditure Required $ 300 Account Number(s): 401 <br /> Amount Budgeted $ 1,350,000 <br /> Additional Required $ -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The 2002 Water Filtration Plant (WFP) Facilities Plan outlined project recommendations to maintain and <br /> improve operations at the plant. Recommended projects include the relocation of Portal 3. The existing <br /> Portal 3 was constructed in 1930 and enabled the City to convey untreated water from Chaplain Reservoir to <br /> distribute through the three transmission pipelines (2, 3, and 4). This facility no longer serves its purpose <br /> (pipeline inlet for reservoir water), and does not meet current seismic construction codes. This advertisement <br /> for bids is for the construction of the Portal 3 Relocation project, the design of which has been completed by <br /> URS Corporation. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize a call for bids for construction of the Portal 3 Relocation project. <br /> \ J\.1 kfl l-P-710: FP Ponal? Relocate CCAgenda-Pi Ad_(or_Bid.doc • 5 <br />