Laserfiche WebLink
• <br /> ' Run Date: 7/6/2004 City of Everett-Public Works Department Cutoff Date: 6/11/2004 <br /> Time: 8:56 AM Contract Estimate Voucher <br /> Project: 165 For Work Order#2857 <br /> Estimate#7 Contractor: KLB CONSTRUCTION <br /> INTERURBAN TRAIL(MADISON TO 44TH P.O.BOX 158 <br /> ST) <br /> WO 2857 BID:$739,954.36 MUKILTEO WA 98275 <br /> TOTAL BID:$766,815.86 <br /> Total Amt Previous Amt Present Amt <br /> Contract Totals to Date $739,181.96 $735,919.46 $3,262.50 <br /> Retained Amounts $36,959.1 t $36,795.96 $163.13 <br /> State Tax Amounts $0.00 $0.00 $0.00 &kitAmounts Paid $702,222.85 $699,123.48 <br /> Amount to be Paid This Estimate3 099. <br /> $ , 31 <br /> • <br /> Checked By / 1.(.C�__. Date 7 - <br /> Recommended By r Date 7 F—a¢ <br /> Public Works Director _ '�,�� Date 7--e-441 <br /> RECORD DRAWING CHECKOFF <br /> Work Order Number:2857 <br /> Inspector. /.. a 1`1Oats:7-7-0q • <br /> Contractor. fanki111111116Pals:1/1/11 <br />