Laserfiche WebLink
Run Date: 7/6/2004 City of Everett-Public Works Department Cutoff Date: 6/11/2004 <br /> Time: 8:56 AM Contract Estimate Voucher <br /> Project: 165 For Work Order#2857 Contractor: KLB CONSTRUCTION <br /> INTERURBAN TRAIL(MADISON TO Estimate#7 P.O.BOX 158 <br /> 44TH ST) <br /> WO 2857 BID:$739,954.36 MUKILTEO WA 98275 <br /> TOTAL BID:$766,815.86 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0001 Surveying LS 15,000.00 1.00 1.0000 tJ 1.0000 0.0000 15,000.00 15,000.00 0.00 <br /> 0002 Moblization LS 45,000.00 1.00 1.0000 d 1.0000 0.0000 45,000.00 45,000.00 0.00 <br /> )003 Traffic Control Labor HR 35.00 600.00 826.0000 v) 826.0000 0.0000 28,910.00 28,910.00 0.00 <br /> 0004 Maintenance&Protec tion of traffic control LS 5,000.00 : 1.00 1.0000 J 1.0000 0.0000 5,000.00 5,000.00 0.00 <br /> 0005 Clearing&grubbing LS 10,000.00 • 1.00 1,0000 1 1.0000 0.0000 10,000.00 10,000.00 0.00 <br /> 0006 Roadside cleanup FA 1.00 5,000.00 524.2500 v 524.2500 0.0000 524.25 524.25 0.00 <br /> 0007 Trimming&cleanup LS 6,500.00 1.00 1.0000 1.0000 0.0000 6,500.00 6,500.00 0.00 <br /> 0008 Removal of structure and obstruction LS 7,000.00 1.00 1.0000 / 1.0000 0.0000 7,000.00 7,000.00 0.00 <br /> 0009 Existing private improve ment restoration FA 1.00 10,000.00 5,869.490e`I 5,869.4900 0.0000 5,869.49 5,869.49 0.00 <br /> 0010 Sawing pavement LF 2.00 5,500.00 5,839.0000✓ 5,839.0000 0.0000 11,678.00 11,678.00 0.00 <br /> 0011 Laurel switching station removal&restoration LS 7,500.00 1.00 1.0000 d 1.0000 0.0000 7,500.00 7,500.00 0.00 <br /> 0012 Remove existing pave ment,type 1,class b SY 10.00 963.00 388,7900J 388.7900 0.0000 3,887.90 3,887.90 0.00 <br /> 0013 Remove existing asphalt curb LF 20.00 16.00 16.0000V 16.0000 0.0000 320.00 320.00 0,00 <br /> 0014 Remove asphalt speed hump LF 20.00 35.00 35.0000 U 35.0000 0.0000 700.00 700.00 0.00 <br /> 0015 Remove cement concrete sidewalk SY 20.00 98.00 43.2900' 43.2900 0.0000 865.80 865.80 0.00 <br /> ')016 Roadway excavation,Including haul CY 16.00 3,300.00 4,125.00004 4,125.0000 0.0000 66,000.00 66,000.00 0.00 <br /> 0017 Remove catch basin EA 200.00 1.00 2.0000 V 2.0000 0.0000 400.00 400.00 0.00 <br /> 0018 Gravel borrow TN 12.00 750.00 440.0500 V 440.0500 0.0000 5,280.60 5,280.60 0.00 <br /> 0019 Catch basin,type A EA 825.00 7.00 12.0000 V 12.0000 0.0000 9,900.00 9,900.00 0.00 <br /> 0020 adjust catch basin to grade EA 300.00 15.00 16.0000 V 16.0000 0.0000 4,800.00 4,800.00 0.00 <br /> 0021 Furnish&install solid lid for catch basin EA 250.00 13.00 15.0000 J 15.0000 0.0000 3,750.00 3,750.00 0.00 <br /> 0022 Storm sewer pipe,8"diameter LF 45.00 67.00 84.0000 '✓ 84.0000 0.0000 3,780.00 3,780.00 0.00 <br /> 0023 Storm sewer pipe,12"diameter LF 60.00 19.00 24.0000 "' 24.0000 0.0000 1,440.00 1,440.00 0.00 <br /> 0024 Ductile iron storm sewer pipe,8"diameter LF 45.00 252.00 167.0000 " 167.0000 0.0000 7,515.00 7,515.00 0,00 ►4`. <br /> ...•A 0025 Connect to drainage structure EA 350.00 3.00 6.0000 `i, 6.0000 0.0000 2,100.00 2,100.00 0.00 <br /> C. 0026 Adjust manhole to grade EA 350.00 1.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0027 Drop manhole connec lion,8"diameter VF 300.00 8.00 8.0000 8.0000 0.0000 2,400.00 2,400.00 0.00 <br />