My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/01/19 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/01/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2017 11:31:29 AM
Creation date
2/3/2017 11:31:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/19/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br /> GCA 4235 <br /> DEFINITIONS OF WORK ELEMENTS AND DELIVERABLES <br /> WORK ELEMENT: Project Assessment Meeting <br /> Description: Schedule participants,meeting facility, and participate in meeting with the STATE <br /> to confirm work element activity requirements, deliverables,and schedule for project <br /> ASSESSMENT. <br /> Deliverable: Project action plan and assessment schedule. <br /> WORK ELEMENT: Prepare or Update Basis of Estimate Document <br /> Description: Prepare or update a"Basis of Estimate"Document that describes the conditions and <br /> context of the estimate's preparation including its intended application. The required content of <br /> this document is identified below: <br /> PROJECT <br /> Sponsor(Lead Agency) INCLUSIONS/EXCLUSIONS <br /> Responsible Person Allowances <br /> Design Org. (Sponsor or Consultant): <br /> Right-of-Way Costs <br /> Estimator <br /> Estimator's Organization Design Fees <br /> Project Location(County) Construction Management <br /> Date of Report Demolition <br /> Start of Construction Hazardous Abatement <br /> Estimating Processing Software Construction Contingency <br /> Estimate available in Excel format ESTIMATE <br /> Work Breakdown Structure(WBS) <br /> Project No. Field Overhead <br /> Database for cost estimate Home Office Overhead <br /> Method of Measurement Contractor Profit <br /> SCOPE Bonds/Insurance <br /> CQC <br /> Mission/Design Subcontractor Mark-Ups <br /> Estimate Type Escalation <br /> Project Type(Greenfield vs.Upgrade) Contingency(Estimating/Design) <br /> New structures required Construction Contingency <br /> Exist. Structures which need to be modified: Allowance(s) <br /> Demolition Begin Construction <br /> Hazardous Materials Construction Duration <br /> Wetlands Issues Labor Rates <br /> Archeological Impacts Labor Burdens <br /> Native American(Tribal)Issues ESTIMATING TEAM <br /> DATA <br /> Lead <br /> Drawings Quantity Survey <br /> Basis of Design/Specifications Unit Cost Development <br /> Site Visits Summarization and Presentation <br /> Meetings Review&QA/QC <br /> Discussions <br /> Page 1 of 4 <br /> Exhibit B I <br /> GCA 4235 <br />
The URL can be used to link to this page
Your browser does not support the video tag.