My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/01/19 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/01/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2017 11:31:29 AM
Creation date
2/3/2017 11:31:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/19/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> GCA 4235 <br /> CITY OF EVERETT <br /> PROJECT <br /> PROJECT NAME WORK ELEMENT DELIVERABLE STIPEND <br /> 1-5/41st Street Interchange Improvements Project Assessment Meeting Project Action Plan and Assessment Schedule $2,800 <br /> Prepare or Update Basis of Estimate Document Updated Basis of Estimate Document <br /> Update Project Cost Estimate Updated Project Cost Estimate <br /> Prepare Project Schedule Project Schedule <br /> Everett Arterial Access Improvements @ I- <br /> 5/US 2 Interchange Project Assessment Meeting Project Action Plan and Assessment Schedule $2,800 <br /> Prepare or Update Basis of Estimate Document Updated Basis of Estimate Document <br /> Update Project Cost Estimate Updated Project Cost Estimate <br /> Prepare Project Schedule Project Schedule <br /> 112th St. SW: Beverly Park Road Corridor <br /> Investments Project Assessment Meeting Project Action Plan and Assessment Schedule $2,800 <br /> Prepare or Update Basis of Estimate Document Updated Basis of Estimate Document <br /> Update Project Cost Estimate Updated Project Cost Estimate <br /> Prepare Project Schedule Project Schedule <br /> 1-5: South Everett Interchange Improvements <br /> (100th St. SE, Everett Mall Way) Project Assessment Meeting Project Action Plan and Assessment Schedule $23,400 <br /> Prepare or Update Basis of Estimate Document Updated Basis of Estimate Document <br /> Action plan to mitigate major or significant risks <br /> Cost Risk Assessment identified by the CRA or CEVP <br /> Prepare Project Cost Estimate Project Cost Estimate <br /> Prepare Project Schedule Project Schedule <br /> Prepare Project Scope/Design Memorandum Project Scope/ Design Memorandum Document <br /> 41st Street Overcrossing / Lowell <br /> Neighborhood Bypass Project Assessment Meeting Project Action Plan and Assessment Schedule $2,800 <br /> Prepare or Update Basis of Estimate Document Updated Basis of Estimate Document <br /> Update Project Cost Estimate Updated Project Cost Estimate <br /> Prepare Project Schedule Project Schedule <br /> EXHIBIT A <br /> GCA 4235 <br /> WN. CITY OF EVERETT <br /> SHEET 4 OF 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.