Laserfiche WebLink
` r <br /> 0 <br /> Contractor issued by the Owner and its addenda; and the Contractor's written response to the <br /> RFP, including the fee proposal and price for Specified General Conditions Work. The terms <br /> and conditions of the Preconstruction Services contract between the Owner and Contractor are <br /> incorporated to the extent necessary to reflect the understanding and intentions of the parties. <br /> "Contractor's Fixed Fee"is the,payment.by the City to the Contractor for profit and'overhead; <br /> the actuatamount=paid to the contractor is equal to the specified percentage for the Contractor's <br /> Fixed Fee times the total construction'cost. <br /> "Contract Sum." In addition to the definition of Contract Sum set forth in Specification section <br /> 00710 (General Conditions), Contract Sum means the Guaranteed Contract Cost. <br /> "Contractor." In addition to the definition of Contractor set forth in Specification section 00710 <br /> (General Conditions),Contractor means the General Contractor/Construction Manager and refers <br /> to Hoffman Construction Company of Washington. <br /> "Engineer" and "Design Team"mean Brown and Caldwell and its subconsultants. <br /> "General Conditions"means section 00710 of Division 0 of the Specifications. <br /> "Guaranteed Contract Cost"("C C")means the'sum of MAC: Contractor's Fixed Fee,'.lump <br /> sum or-Specifled<1General Conditions,Pcrforniance Incentive and.applkable Washington State <br /> Sales°Tax. <br /> "Maximum Allowable Construction Cost" and "MACC"mean the sum set forth in the table <br /> above and further described in the Contract Documents. <br /> "Owner-directed Change"means an explicit change in the Scope of Work directed by the Owner <br /> for which the Owner is responsible. <br /> "Project"means the Water Pollution Control Facility Expansion Phase A. <br /> "Project Manager"means the person designated by Contractor to act as its manager of the Work <br /> of this Project. <br /> "Project Team"means the Owner, Engineer and GC/CM of the Project. <br /> 2. WORK OF THIS CONTRACT <br /> 2.1. General <br /> The Contractor shall provide full general contracting services for construction of the Project in <br /> accordance with the requirements of this Contract and RCW 39.10.061. Throughout the term of <br /> this Contract, Contractor shall cooperate with the Owner and Design Team to construct the <br /> Project on time and within the GCC and to conduct all construction activities in a manner which <br /> Everett Water Pollution Control Facility Expansion Phase A <br /> Construction Agreement 2 <br /> 20 <br />