2.0 SEWER LINE STATE CONTRACT WORK AT UTILITY COST <br /> 2.1 SEWER LINE CONTRACT BID ITEMS <br /> Item# Unit Description Est Qt*stimated Cost Agreement Total Bid Qty _ Bid Cost _ Bid Total Difference <br /> 1 <br /> 1 % Mobilization' 10.0% $379,732.00 $37,973.20 7.4% $552,162.75 $40,940.44 $2,967.24 <br /> 19 M2 Gravel Borrow Incl Haul 0 $0.00 $0.00 9755 $9.85 $96,086.75 $96,086.75 <br /> 44 EA Sewer Cleanout 9 $1,000.00 $9,000.00 9 $395.00 $3,555.00 ($5,445.00) <br /> 45 M Testing Sewer Pipe 1246 $5.00 $6,230.00 1246 $8.50 $10,591.00 $4,361.00 <br /> 46 M PVC Sanitary Sewer Pipe 150mm Dia 183 $70.00 $12,810.00 183 $110.00 $20,130.00 $7,320.00 <br /> 47 M Ductile Iron Sewer Pipe 300mm Dia 94 $200.00 $18,800.00 94 $165.00 $15,510.00 ($3,290.00) <br /> 48 M Ductile Iron Sewer Pipe 380mm Dia 242 $250.00 $60,500.00 242 $193.00 $46,706.00 ($13,794.00) <br /> 49 M HDPE SDR 26 Storm Sewer Pipe 300mm Dia(Nominal Dia) 728 $110.00 $80,080.00 728 $185.00 $134,680.00 $54,600.00 <br /> 50 EA Connection to Existing Sanitary Sewer Manhole 7 $1,500.00 $10,500.00 7 $3,500.00 $24,500.00 $14,000.00 <br /> 99 M3 Asphalt 0 $0.00 $0.00 175 $41.65 $7,288.75 $7,288.75 <br /> 263 Hrs Traffic Control Labor 0 $0.00 $0.00 720 $34.50 $24,840.00 $24,840.00 <br /> 264 Hrs Vehicle 0 $0.00 $0.00 45 $75.00 $3,375.00 $3,375.00 <br /> 265 Hrs Traffic Control Supervisor 0 $0.00 $0.00 360 $35.50 $12,780.00 $12,780.00 <br /> 267 M3 Structure Excavation Class B 4363 $20.00 $87,260.00 4448 $8.00 $35,584.00 ($51,676.00) <br /> 268 M2 Shoring or Extra Excavation Class B, Incl Haul 4213 $4.00 $16,852.00 4295 $2.75 $11,811.25 ($5,040.75) <br /> 269 LS Dewatering " 0 $0.00 $0.00 1 $10,000.00 $10,000.00 $10,000.00 <br /> 271 EA Plugging Existing Pipe 16 $500.00 $8,000.00 24 $150.00 $3,600.00 ($4,400.00) <br /> 298 EA Abandon Existing Manhole 10 $500.00 $5,000.00 11 $650.00 $7,150.00 $2,150.00 <br /> 299 EA Adjust Manhole 0 $0.00 $0.00 55 $575.00 $31,625.00 $31,625.00 <br /> 300 EA Sewer Manhole Type 1-1200mm Dia 8 $4,000.00 $32,000.00 8 $1,750.00 $14,000.00 ($18,000.00) <br /> 301 EA Sewer Manhole Force Main Discharge Structure 1 $6,000.00 $6,000.00 1 $3,500.00 $3,500.00 ($2,500.00) <br /> 302 M Manhole Additional Height, 1200mm Dia 13 $900.00 $11,700.00 13 $450.00 $5,850.00 ($5,850.00) <br /> 303 EA Drop Manhole Connection 5 $3,000.00 $15,000.00 5 $3,800.00 $19,000.00 $4,000.00 <br /> 311 LS Remove/Relocate Existing Utilities $0.00 $0.00 1 $10,000.00 $10,000.00 $1.0,000.00 <br /> Subtotal $417,705.20 $593,103.19 $175,397.99 <br /> Sales Tax @ 8.8% $36,758.06 $52,193.08 $15,435.02 <br /> Subtotal $454,463.26 $645,296.27 $190,833.01 <br /> Engineering @ 15%* $68,169.49 $96,794.44 $28,624.95 <br /> Subtotal $522,632.75 $742,090.71 $219,457.96 <br /> Indirect Costs @ 10.01% $52,315.54 12.06% $89,496.14 $37,180.60 <br /> 2.0 Total Sewer Line Estimated Agreement Amount(off CITY Cost $574,948.28 Total Actual CITY Cost $831,586,85 $256,638.56 <br /> 1.0 Total Waterline Estimated Agreement Amount @ STATE Cost $295,005.22 $448,670.31 $153,665.09 <br /> Total Estimated Agreement Amount $869,953.51 $1,280,257.16 $410,303.65 <br /> " Engineering costs will be determined by a proration of the engineering costs of the entire project to the construction costs of the work <br /> covered by this agreement. No billing, except for Advance Payment when appropriate,will be made to the CITY for any charges, <br /> including Engineering, until such time as the work on the CITY's portion of the construction work has actually begun. Billing for proration <br /> of Engineering and Mobilization will cease when the work on the CITY"s portion of the construction work has been completed and shall be <br /> in proportion to the CITY's percentage of responsibility. Mobilization is based on actual bid amounts. Ca3 <br /> Indirect Costs are adjusted annually and the STATE bills the Indirect Cost rate current at the time the work is being billed. <br /> The Indirect Cost rate shown in this agreement is the Indirect Cost rate at the time that the estimate was prepared and may <br /> not reflect the actual Indirect Costs billed. Indirect Costs typically vary by 2%to 2.5%per year,usually it increases but it has <br /> sometimes decreased. The current Indirect Cost is used for estimation purposes and may not represent billed rates. <br /> i I IT nnn ') c,,..nll.m..nf .1 C..1.;L.I1 In I In...... 7 ..F 7 <br />