My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/04/27 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/04/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2017 4:13:08 PM
Creation date
2/7/2017 4:12:05 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/27/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 F� <br /> 9.5 Deliverables <br /> 1. Everett specific diurnal curve for use in the model. <br /> 2. Report on data collected during field studies. <br /> 3. Calibrated hydraulic model capable of simulating the Everett Water transmission and <br /> distribution systems in both steady state and extended period modes. <br /> 4. E-mailed draft and final CWP Chapter 4— System Analysis <br /> 5. Capital Improvement listing and map determined from modeling <br /> 10.0 Task 10 - Regulatory Compliance Program (CWP <br /> Chapter 7) <br /> 10.1 Objective <br /> Work with City staff to develop a plan for existing and continued compliance with State and <br /> Federal Safe Drinking Water Act requirements. <br /> 10.2 HDR Services <br /> 1. Describe Safe Drinking Water Act and Washington State Administrative Code drinking <br /> water regulations applicable to the City for: <br /> • Existing Regulations <br /> • Proposed Regulations <br /> • Anticipated Regulations <br /> 2. Review the City's water quality compliance data from 1999-2004. <br /> 3. Review the City's existing regulatory compliance monitoring plans. <br /> 4. Document compliance status. <br /> 5. Prepare recommendations regarding existing monitoring plans and/or treatment practices <br /> based on existing or proposed Safe Drinking Water Act regulations. <br /> 6. Conduct an evaluation of Stage 2 Disinfection Byproduct Rule Initial Distribution System <br /> Evaluation (IDSE) compliance strategies. <br /> • Determine Standard Monitoring Program sampling requirements <br /> • Compare existing hydraulic model capabilities to IDSE compliant model requirements, <br /> to determine feasibility of conducting a System Specific Study. <br /> • Estimate costs associated with making necessary updates to model. <br /> • Recommend an IDSE compliance approach. (Subsequent work associated with <br /> updating the model and calibration requirements for IDSE compliance are scoped in <br /> Task 9). <br /> 7. Prepare Comprehensive Regulatory Compliance Plan <br /> 8. Review and document the City's procedures for handling customer inquiries <br /> 9. Document use of certified laboratories <br /> 1. 140 <br /> Everett Comprehensive Water Plan April 15, 2005 <br /> Exhibit A—Scope of Services Page 15 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.