Laserfiche WebLink
rIA 11 <br /> 10.3 City Responsibilities <br /> 1. Provide existing water quality monitoring plans and requested regulatory compliance data <br /> from 1999-2004 for review. <br /> 2. Attend two meetings (one to review existing data, one to discuss IDSE compliance <br /> strategies) <br /> 3. Assist with development of Comprehensive Regulatory Compliance Plan <br /> 4. Review draft chapter and provide comments <br /> 10.4 Assumptions <br /> 1. The recommendation for IDSE compliance strategy does not include development of the <br /> IDSE monitoring plan. At the City's request, an additional services scope of services will <br /> be prepared for the development of the IDSE monitoring plan. Additional work for <br /> developing the hydraulic model as an IDSE compliance strategy is scoped under in Task 9. <br /> 2. Existing monitoring plans will be updated and modified. <br /> 3. Two meetings will be attended to complete this section of the CWP. <br /> 10.5 Deliverables <br /> 1. E-mailed document files of the draft and final Draft CWP Chapter 7 <br /> 2. E-mailed document files final CWP Chapter 7 <br /> 3. IDSE compliance strategy Technical Memorandum <br /> 11.0 Task 11 — Operations and Maintenance (CWP <br /> Chapter 8) <br /> 11.1 Objective <br /> The objective will be to describe the Operation and Maintenance Program to fulfill the <br /> requirements of the DOH. <br /> 11.2 HDR Services <br /> 1. Meet with City staff to review 2000 CWP and update the following sections: <br /> • Organization Structure and Responsibility <br /> • Operator Certification <br /> • System Operation, Maintenance and Control <br /> • Emergency Response Operations <br /> • Safety <br /> • Cross Connection Control <br /> • Supplies and Equipment <br /> • Record Keeping and Reporting <br /> • O&M Improvements 1 1 1 <br /> Everett Comprehensive Water Plan April 15,2005 <br /> Exhibit A—Scope of Services Page 16 of 21 <br />