Laserfiche WebLink
Lll 1 Vt 1;vracy,11 <br /> 4 REVISED FINAL CONTRACT VOUCHER CER I'IFICATION <br /> ONTRACTOR: Rinker Materials ADDRESS: P 0 Box 2037 <br /> TTY: Everett STATE: WA 98203 DATE: May 16, 2005 <br /> ROJECT TITLE: 2004 Hot Mix Asphalt Overlay WORK ORDER NO. PW3184 <br /> 1A1E WORK COMPLETE: December 18, 2004 FINAL AMOUNT: $ 830, 768.40 <br /> CONTRACTOR'S CERTIFICATION <br /> the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> ❑d material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> athorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> mployee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> Ionics due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> nderstand the same and that I hereby release the City of Everett from any and all claims of whatsoever nature <br /> ,hich I may have, arising out of the performance <br /> of said contract, which are not set forth in said estimate. <br /> ✓�I lA�l (-0 x °A-. A E f ' et <br /> 'ONTRACTOR TITLE <br /> sinker Materials <br /> • GPR Esq <br /> ubscribed and sworn to before o�MNss►°HF� L��' <br /> :� <br /> l i5? y of (Y1 Ay 2-005 NOTARY N <br /> w � Notary Publicp''— <br /> ► and for the State of Washington, residing at1/4-10 <br /> /. �Bl►C <br /> :. X08 <br /> WAstilt4 <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> Certify the attached final APPROVED Date: Z//t <br /> ;timate to be based upon actual <br /> ieasurements and to be true and correct. �f <br /> . X <br /> Construction Manager Utilities Director <br /> Tom Fuchs Tom Thetford <br /> INSTRUCTIONS <br /> he Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> gents and forwarded with the Final Contract Voucher Certification. <br /> 'ontractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> tached. <br /> evised 9/94 <br /> 6 <br />