My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amend 2 Civic Plus Advantage
>
Contracts
>
Agreement
>
Technology
>
Amend 2 Civic Plus Advantage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2017 11:38:09 AM
Creation date
2/9/2017 11:37:55 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Civic Plus
Approval Date
12/21/2016
Department
Administration
Department Project Manager
Meghan Pembroke
Subject / Project Title
Amendment 2
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Total Compensation
$3,138.00
Contract Type
Agreement
Contract Subtype
Technology
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
col Proposal for the City of Everett,WA <br /> goals, a follow-up report reviewing the results of implemented suggestions. <br /> Phase 1: Intranet Consultation Three days on-site, Quote includes travel expenses. <br /> A consultation package concentrating on evaluating and Improving current functions of <br /> interdepartmental relations and recommendations for increasing effectiveness through the <br /> use of all available web tools. Optional <br /> Deliverable: A comprehensive report on all findings regarding the current intranet $10,000 <br /> system being used and success rate of current system functions,a detailed plan for <br /> making improvements and adapting the intranet system to your needs,a follow-up <br /> report reviewing the results of implemented suggestions, <br /> Phase 5: Consolidation of Identified External Site--Full Content, less than 100 pages Optional <br /> An option that allows for pages of content to be migrated from sites other than the current <br /> primary site to the new primary site. Migration of top-level navigation is included. $2,450 <br /> Phase 5: Consolidation of Identified External Site—Full Content, more than 100 <br /> pages, 50 page block An option that allows for pages of content to be migrated from sites Optional <br /> other than the current primary site to the new primary site. Migration of top-level navigation $1,400 per block <br /> is included. <br /> Phase 4: xx Days of Customized On-Site Implementation Training for up to 12 Optional <br /> employees <br /> Quote includes travel expenses($80 per person per day for the 13th attendee and beyond) $XX <br /> Phase 4: xx Hours Customized Interactive Webinar Training for up to 6 employees Optional <br /> Quote includes free use of up to 6 webcams and headsets $XX <br /> Phase 4:Training/Consulting Two days on-site Review website with department Optional <br /> administrators and provide additional time for basic learners. Review website procedures. <br /> Must be held concurrently with original on-site training session. $7,800 <br /> Post-Training: Website Presentation Two days of on-site meetings to present website to Optional <br /> stakeholders. Quote includes travel expenses. $7,800 <br /> Post-Training:Three-Month Checkup Held three months after go-live, includes two days Optional <br /> on-site of additional consultation/training. Quote includes travel expenses. $7,800 <br /> Post-Training: Three Day Annual Refresher One day on-site consultation,two days on- Optional <br /> site refresher/advanced training. Quote includes travel expenses. $10,000 <br /> Post Go-Live: 50 Pages of Additional Content $1,450 <br /> Optional$5,700 <br /> Virtual Webmaster: Five Hours of Content Updates per month. <br /> Annual Minimum <br /> Annual Recurring Training: Training on new functionality and services <br /> Deliverable: <br /> • New User Training:A three-hour training for new users to learn basic <br /> features of the GCMS®. Optional <br /> • Refresher Training/New Module Training: A three-hour session designed to $2 000 <br /> refresh existing users as well as to train them on new modules. <br /> • New Feature Overview: A three-hour session designed to make users aware Annually <br /> of recently released modules and features. <br /> • Website Review Consulting: An hour-long, in-depth review of the client <br /> website followed by a two-hour session with client users. <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.