Laserfiche WebLink
� � Clatemont Village Inc. <br /> � ro <br /> Contract Rezone Agre�eat 797-51 <br /> H <br /> G H � Page -5- <br /> b y N <br /> i� Z � <br /> � H A <br /> 2, The proposed development as depicted in the site plan is consistent with <br /> ro y M the B-2 zonin� standards in the axea. The change of the total square <br /> footage of the buildings will not be significant and will not change the <br /> � � � use of the s1te. The site will provide greater landscaping aad <br /> m <br /> o H pedestrian circulation and be more con�istent with ehe existing C ty <br /> ti � ° cudes. <br /> M , <br /> � y 3, The requested iezone will not 6e detrimeatal to adjoining properties and <br /> H ,� wi11 be a benefit to the community. <br /> N <br /> ° y 4. Increased landscaping and huffers srill result with the amendments to the <br /> c � r rezoae. <br /> � o � <br /> 5, The proposed rezone is consistent crith the zoning laws of the City of <br /> Everett and the State of Washington. <br /> DECISION <br /> Based upo❑ the pr.ecediag findingF of facts and conclusioos, the testimony and <br /> evidence submitted at the public hearing, and upon the impressions of the <br /> Hearing Examiner of the site view, it is hereby cecommended [o the Everett <br /> City Council that the contract rezone, origivally approved by the City in <br /> Ordi¢ance 0797-81, be amended to allow tevisions of locations of bu3ldings in <br /> Phases I and II of the development at the Claremont Village Shopping Center, <br /> 47th to SOth Street, cn Evergreen Way, Everett, +�ashington. <br /> � l������ � In addition, minor changes in landscaping requirements, uses, and parking, <br /> � shoald be allor+ed. These chan�es aie set forth in the following conditions or <br /> 1 recommendations: <br /> �� 1. Detailed dracrings in accoidance with City Design and Construction <br /> ��' Standards shall be su6mitted to the Public Works Department showing s:te <br /> � ' parking layout, landscaping, utilities, stoxm drainage, and temporary <br /> coustructio❑ erosion control. Pub11c Works Depa=,:ment approva� of these <br /> � `�� dra�ri.ngs is required prior to any permits teing issu�nd. All <br /> - j s��q improvements shall be completed and approved wasranted before any <br /> Occupancy Pe=mit is issued. <br /> 2. Spectal chargea for connection to [he seWer and water systems ia <br /> `�� accordance with Ordinauce 1t1171-85 ace applicable. The actual cost <br /> � shall be c::mpueed by tha Building Department per the ordiaance in effect <br /> at the tlme ann accordance to the information on the approved plans on <br /> '� the date of permit issuaace and shall be paid in accordaace with the <br /> r��� ' provisions of the ordinance. <br /> � <br /> � � %�; 3. On-site detention is required, or, in lieu of providing on-site <br /> , �� � detention if the downstream storm-water systems have the capacity to <br /> I �I I. haadle the addiCional runoff, then payment to City Drainage Fund 340 is <br /> �� allowed. A1l �-on-site detention and stoxm water systems must --6e <br /> conaietent with any other agree�ents entered betWeen the Applicant or <br /> Applicant's ;:redecessois and the CSty. <br />