My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4717 EVERGREEN WAY 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
4717
>
4717 EVERGREEN WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2017 4:05:10 PM
Creation date
2/9/2017 4:04:08 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
4717
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � H . <br /> , � -' <br /> � <br /> � � <br /> H <br /> b N N <br /> � � � INFORMATION FOR THE DEVELOPER <br /> o '� � 1. Detailed drawings in accordance with C1Ly design and construction <br /> b y Ht� standards shall be submitted to the Public Works Department showing site <br /> � z � parking ?.ayout� landscaping� utilities� storm drainage, and all required <br /> �y improvements in the publie �ight-of-way. Public Works Department <br /> z � op approval of rhese drawings is required pcior to any permits being issued. <br /> o� • CI <br /> � y � 2. City streets are to Se kept clear of dirt and debris at all times during <br /> construction. Dust suppression and street cle2ni.ng must occur as <br /> 5� u~i H directed �y the Pubiic Works Inspector. <br /> RoH <br /> � � 3• A two year guarantee is :•equired for private retention/detention or othar <br /> .� � drainage treatment/aUatement facilities serving areas larger than one <br /> acre. <br /> 4. This development should consider wethods to reduce the existing flooding <br /> problem at the shupping center as part of Phase I rehabilitation. For <br /> Phase II� the City would like to construct an underground detention vault <br /> to ellminate the flooding problem. The vault could provide detention for <br /> Phase II as :+ell as eliminate the flooding problem if the developer is <br /> agree�ble to a ,�oint project. The City would like a meeting with the <br /> developer to discuss such a project. <br /> 2o43F <br /> ���i„ <br /> � <br /> 1� 1�� � <br /> � --'. <br /> � ' - <br /> __ <br /> , __ <br /> , <br /> �; !1 i . <br /> I <br /> ol.�i <br /> -u- <br />
The URL can be used to link to this page
Your browser does not support the video tag.