Laserfiche WebLink
. • � ��� � `t ��Ph.�-�aa.�e� <br /> May 28, 1981 fa <br /> ;'* y-�: <br /> Mr. Jay Larson <br /> h 5enior Real Estate Officer <br /> Seattle First Naticnal Bank <br /> P. O. E)ax 3356 <br /> Seattle, WA 98124 <br /> Subjects Easement for Sewer <br /> Dear F�ir. Larson: <br /> As per our piione conversation a couple of weeks ago, I have enclosed three (3) <br /> wptes of the t:asement Agreement for executIon by your firm. Also attached <br /> are prints of tfie construction drawing showing the work planned around the Aanl<. <br /> We �vould like to have two (2) of the executed and notarized Easement <br /> Agreemenis returned to us, the other one 'ss for your file. <br /> As we discussed, the L-asement Agr�ement is conttngent on ihe following <br /> conditions: <br /> l. The parkin� lot surface shall be rr.stored after tha se�ver llne is <br /> constructed. <br /> � 2. Parking stall lines, traffic dlrection acrows a�id curbs removed hy <br /> constr�ction shall be replaced. <br /> 3. The Conuactor shal! contact the Bank's Branch "�ianager at least <br /> '�8-hours prlor to construction and coordinate his act[vities wlth <br /> the Bank's �ranch Manager in order to provide access at ali times <br /> during constructlon and to assure that the Bank w(ll loose a minlmum <br /> ; of parking spaces during construction. <br /> i 4. In order to malntain access to the Seattle First's drive-In viindow, <br /> the Contractor shall not construct Yhe sewer across tfie drlve-in <br /> + window access lanes, Sta 4+G5 to Sta 5+05, durtng working hours <br /> l (9 am to 5 pm) on weekdays. The trench must be backfilled to <br /> �round surface over the constructlon before 9 a.m. on a weei<clay. <br /> ' Tlie asphalt patch ior the drIve-in tvindow lanes shall be done on <br /> a mId-wee:< morning before 10 a.m. Traffic shall be allowed over <br /> completed lanes durinP paving operations. <br /> � <br />