Laserfiche WebLink
• � � <br /> Notes to Applicant: <br /> 1. If a variance is approved, building permits are required and <br /> must be obtained within one year from the approval date after <br /> wt�ich the Board of AdjustmenYs decision shall cease to be <br /> effective. Prior to the expiration date, a written request for a <br /> six-month extEnsion may be submitted to the Planning <br /> Diiector. <br /> 2, A building permit is required. An electriral permit is required if <br /> the sigr is to be lighted. Conformance with current structural <br /> codas is required. <br /> 3. A copy of this order must be submitted by the Applicant when <br /> applying 'or building permits. <br /> _:..� <br /> _:.� <br /> � s� <br />