Laserfiche WebLink
i <br /> I <br /> ( • . Housing Hope 3hort Plat <br /> Drainege Analysis <br /> Page 2 <br /> I <br /> IExisting Runaff Patterns ' <br /> Due to Pigeon Croek, the site is divided inro two diainage sub-basins (see Figuro A). <br /> I__ <br /> Basin A (Southwest region including Lots 1-3)contains b.39 ac:es which drain to the northeas4 <br /> I . The area draining in Basin A travels as sheet flow and dischazges into Pigeon C¢ek. Adjacent lots <br /> � on the southwest side of Basin A have slopes which appear to direct some of its flow towards <br /> Basin A (sec Figure�B), <br /> fBasin B (Northeast region including L.ot 4)contains 0.82 acres which drain to the west. The area <br /> draining in Basin B initially travets as shept flow from Evergreen Way and appears to become <br /> shallow concentrated as it discharges on the northwest side. Drainage from adjacent lots on the <br /> nonh side of Basin B appear to not enter the basin and flow parallel to tl�e north property 3ine. <br /> ICurtently, Pigeon �reek,serves as a stonn drainage system and originates from a reservoir on the <br /> ( east side of Evergreen Way and discharges into Possession Sound. The creek enters the property <br /> on the soudieast side and exits on the northwest cornec Existing 60-inch and 24-inch culverts <br /> outfall into the creek on tlie sautlieast side of the propeny and midway through the site an existing <br /> { 42-inch culvert d'u•ects the flow under an old driveway. The creek exits the property througli two, <br /> 48-inch concrete cu(verts under Fleming Street. ,. , _. , , _ , , „ <br /> � Pigeon Creek consisis of earth lined sides ranging from near vertical to 1:1 slopes. The bottom of <br /> � the creek is lined with cobbles,concrete<md rock. The width of the creek varies between 6 feet <br /> and 10 feet and the gredient is approximately 2.94 pe��:ent. <br /> 'l Tl�e City oi Bve��ett has modeled the expected peak tlows in the creek. Tl;e 25-year and 100-year <br /> flows are 170 cfs and 207 cfs, respectively. Given tliese flows, the estimated maximum depdi of <br /> � the creek is 3.83 feet(see calculations in Appendix). The side slopes of the channel appear to be <br /> stable and of adequate capaciry to convey the design sto�m without overtopping or tlooding <br /> I adjacent a��eas. During large storni events, Uiere may be some flooding but diis overtopping should <br /> � not affect a�iy of die buiidings or ac�jacent propeiYies in the vicinity. 'fhe design of the detendon <br /> Ifaciliry on site would provide attenuati�n of sromi ivnoff up to the 100 year retum Crequency, <br /> I , . <br />