Laserfiche WebLink
. �_ � <br /> 3. GTE Northwest Incorporated has facilities,near this location. However, any <br /> buildinp entrances must be coordinated at least 60 days in advance. The cost of <br /> any relocatior, of GTE facilities that is required to construct the new apartments <br /> will be at the total expense of the developer. My relocation wili take 60 to 120 <br /> days. Please contaG Debbie Condron, Engineer-OSP at 356�053 if yau have <br /> any questions reyardinfl this building entrance. <br /> 4. Although little is knovm of the history of this structure, it would very iikely be <br /> eligible for the Everett Register, because of its age, more than 50 years, its <br /> architectural interest and because it is unique in being a historical residential <br /> structure in the midst of commercial strip development. The Everett Historical <br /> Commission would be pleased t� undertake the necessary research to document <br /> the struciure and consider a nomination. <br /> Because this is a unique structure, particular attention should be paid to <br /> retainin� the historic residential character of the house. The surrounding <br /> development, in particular the daycare center, should be designed to <br /> complement the historic residence. If possible the parking and access rcad <br /> across the front should be reconfigured and landscaped to showcase the <br /> eritryway to the renovated building. Originally, there was probably lawn in the <br /> front. <br /> Consideration should be Qiven to planting trees in a treelawn between the street <br /> and the new sidewalk. This would provide a buffer from the heavy traffic on <br /> Evergreen Way for pedestrians and Vansit riders. The separation would also <br /> prowde a bit of safety for those on the street with children coming and going to <br /> the daycare facility. <br /> The Historical Commission worked with the architecture fiRn Stickney and <br /> Murphy and Housing Hope on the Commerce Building and would en�oy <br /> consulting with them again on this project. <br /> 5. GTE Northwest Incorporated will provide service to the site. However, new <br /> telephone ceble construction will be required in conjunction with the site <br /> development. GTE's engineering will begin when they are notified of your <br /> construction schedules and telephone requirements. <br /> It will be the developers responsibility to provide a suitable combination of <br /> conduit and trenching and/or risFr conduit to accommodate GTE's network <br /> communications cable within the complex. Provided that an acceptable <br /> combinat�on of conduit and/oc trenching is incorporated into the project to <br /> accommodate GTE's entrance c�ible, there will be no costs to the developer for <br /> GTE's cable. <br /> If a rearrangement of existing cables on premises or on ihe right-of-way is <br /> necessary, appropriate charges will be estimated and GTE's Guaranty of <br /> Payment form will be forvvarded to you for your signature. Prior to <br /> commencement of GTE's engine�sring for such rearrangement, a deposit will be <br /> required. To insure timely telephone service, GTE requests ninety (90) days <br /> lead time for engineermg, procurement, and installation of cable and/or GTE's <br /> equipment. <br /> , <br /> Please cantact Michael Hupf, Senior Engineer, at 356-4052 should you require <br /> additional information. <br /> 13 <br />